24/7 Emergency Call-Out

Dark Overlay

Data Centres &
Telecoms

Home » Sectors and Case Studies » Data Centres & Telecoms

Reliable Power Solutions for Data Centres & Telecoms

In today’s communications age, consumers and organisations expect 24/7 access to data and connectivity. This places enormous pressure on telecoms providers and data centre operators to maintain strict uptime standards. For Facilities Managers, Procurement Teams, and senior decision-makers, power continuity isn’t optional — it’s mission-critical. We’ve delivered uninterrupted power across 150 fibre network sites, demonstrating the scale and reliability this sector demands. 

Why Power Continuity Matters for Data Centres & Telecoms

  • Protect Network Uptime – Avoid costly outages that impact customers and SLAs.
  • Safeguard Critical Infrastructure – Keep servers, cooling systems, and telecom equipment running without interruption.
  • Reduce Operational Risk – Ensure compliance and maintain brand reputation with guaranteed resilience.

Ready to Protect Your Network? Speak to the UK’s Leading Technical Experts

Contact Us

Our Expertise in Power for Data Centres

For decades, Shenton Group has supported telecoms companies and data centres with dependable, scalable power solutions. We understand the unique challenges of high-demand environments and the importance of uninterrupted service for both operational and financial performance, including delivering uninterrupted power solutions across a national rollout of 150 fibre network sites, and providing ongoing national maintenance support to a major gas network provider’s critical remote infrastructure, a similarly distributed, always-on operating model to telecoms. 


Standby Generators and UPS Systems

Our solutions include:

  • Standby Generators – Gas or diesel options to bridge power gaps during outages or upgrade works.
  • Uninterruptible Power Supply (UPS) – Seamless power continuity for critical systems.
  • Emergency Generator Hire (Power Call) – 24/7 rapid response for sites with restricted capital expenditure.

These combined solutions ensure your operations remain resilient, even during unexpected failures or planned maintenance.

See how we’ve helped leading telecoms providers and data centres maintain uptime and protect their operations:

Power for Fibre, Mobile & Distributed Network Sites

Telecoms and data centre estates are rarely a single site — they’re a distributed network of locations, often including remote or unmanned cabinets and exchanges. This changes what “power continuity” needs to mean in practice:

  • Multi-site rollout at scale — as demonstrated across our 150-site fibre network deployment, consistent specification and delivery across many locations matters as much as the technical spec at any single site. 
  • Remote monitoring as standard — with sites spread nationally, 24/7 remote monitoring lets issues be caught and often resolved before they cause a customer-facing outage. 
  • Restricted capex flexibility — Power Call’s rental model suits network operators who need resilience at a large number of sites without capital expenditure at every one. 

F&Qs


Our Latest News

  • Director of Property, Leading Healthcare Provider

    I am the Director of Property for **********, operating *** residential nursing homes across the UK. For around six years, Power Call has provided outstanding emergency generator support, now covering over 80 of our homes, with 30 more planned next year. Their service is exceptional—reliable, responsive, and consistently exceeding expectations, regularly delivering, installing, and commissioning … Continued
  • Tue, August 16, 2011 – Finance Director – Care Home Group

    Tue, August 16, 2011 – Finance Director – Care Home Group shentongroup’s Power Call service is a cost effective solution to providing standby power for our Care Home
  • Service Manager – Real Estate

    I would just like to pass on from both Mike, and myself our appreciation, and sincere thanks to you and the rest of Shenton Team. During the evening, and our day spent factory testing the whole ethos of the group shone through, and for QVC it is a real pleasure to be working in conjunction … Continued
  • Fri, April 26, 2013 – Facilities Maintenance Contract Manager, County Council

    Fri, April 26, 2013 – Facilities Maintenance Contract Manager, County Council Can you please give my thanks to the shentongroup engineers for successfully completing the generator panel modifications and testing of the system, I would like to thank Paul in particular for coping with the challenging situation under pressure, the shentongroup engineers performed excellently and … Continued
  • Wed, August 31, 2016 – Project Manager, M&E Company

    Wed, August 31, 2016 – Project Manager, M&E Company I understand everything was up and running by 8:15pm, which was absolutely brilliant and the ***** Director was very pleased.  Thanks for all your help last night; I know it was very last minute. We will be forwarding the official order this morning.  I believe its things … Continued
  • Tue, September 27, 2016 – Director, Electrical Services Company

    Thank you, the client and ourselves are pleased with your installation
  • Fri, April 26, 2013 – Electrical Contractor

    Fri, April 26, 2013 – Electrical Contractor We are very happy with your service and have no suggestions for improvement everything went as planned with no hiccups. Thank you for your efforts.
  • Thu, September 29, 2011 – Projects Manager MOD Site

    Thu, September 29, 2011 – Projects Manager MOD Site shentongroup site operatives were clean and tidy, courteous and professional in their conduct.
  • Wed, September 18, 2013 – Prepayment Operations & Client Manager for a Global Technology Company

    Wed, September 18, 2013 – Prepayment Operations & Client Manager for a Global Technology Company Just to let you know that all went well and install is completed.  Thanks for a strerling job once again.  Pass my thanks onto Alex and Andrew.
  • Sat, October 01, 2011 – IT Manager, Lift Manufacturers

    Sat, October 01, 2011 – IT Manager, Lift Manufacturers The installation of the air conditioning was completed on time and to our complete satisfaction.
  • Wed, June 10, 2015 – Electrical Project Manager, Large Engineering Services Company

    Wed, June 10, 2015 – Electrical Project Manager, Large Engineering Services Company …the technical liaison, proposed design, technical submittal, prompt reactions and quality of components and workmanship has been very good…The installation process dates when declared where adhered to and undertaken in a professional manner, under difficult circumstances with constant main contractor external works on-going around the access area … Continued
  • Mon, December 20, 2014 – Owner, Large Manor House

    Mon, December 20, 2014 – Owner, Large Manor House From my request for quotation to commissioning I was pleased with the prompt and efficient way your company and staff carried out the supply and delivery of the set. The delivery in spite of the short lead time was on the date promised and during the interim … Continued