Shenton Group’s solution provides the Bristol City Council network with huge electrical and heat savings and provides reductions in the city’s environmental impact.
Backup Power Solution For Marble Arch Place, London
Marble Arch Place, located on Bayswater Road, Marylebone, London, is a new mixed-use development. Shenton Group designed, supplied and installed the life safety and backup power solution for the site.
Backup Generator Solution for Ilona Rose House
Client: Gratte BrothersSector: Mixed-Use Development Location: Soho, London Products/Services 1850kVA generator with MTU engine 75@1m bespoke acoustic enclosure Remote radiator Interconnecting coolant pipework 2-hour fire-rated inlet and outlet dampeners Forced air ventilation system Remote fill point cabinet utilising Secon-x pipework to the bulk fuel tank 50 meters of flue Background…
CHP Solution Provides University of Exeter with Energy Savings
Client: Whitehead Building ServicesLocation: Exeter Products/ Services 2 x 120kWe CHP units Low noise acoustic enclosures Delivery, off-loading and positioning G99 relay G99 application process and witness testing System commissioning Supply of ancillary valves, connections and control equipment CHP maintenance contracts BACKGROUND For many years Exeter university has been…
Generator and CHP Package for Major Residential Development London
BACKGROUND The Winstanley & York Road development planned to deliver new housing blocks overlooking the park. High rise residential buildings, a range of commercial, leisure and community spaces, a short distance from Clapham Junction Station. Fundamental to any new residential development is the need for efficient heating and a reliable…
CHP Solution for 145 City Road, London
Client: Vital EnergiSector: Residential & Mixed-Use DevelopmentLocation: London Products/ Services 1 x 150kWe bespoke CHP unitDelivery, off-loading and positioningG59 relayG59 application process and witness testing System commissioning Supply of heat and gas metresCHP maintenance contracts BACKGROUND The developer appointed our client Vital Energi to deliver the energy centre plant room for…
CHP Solution for Canterbury Christ Church University Halls of Residence
Client: Canterbury Christ Church UniversityLocation: Canterbury South East Products/ Services: 1 x 80kWe CHP unit Low noise acoustic enclosures Delivery, off-loading and positioning System commissioning CHP maintenance contracts BACKGROUND In 2018 Canterbury Christ Church University was building a new halls of residence campus for its students. This prosperous university…
Shenton Group Provides CHP Solution for Prestigious Housing Development
Client: Kingsland Wharves Location: East London Products & Services supplied: CHP maintenance contracts OverviewSet within a historical conservation area, Imtech Aqua Building’s Kingsland Wharves housing development consists of 207 dwellings, split 58 dwellings in two blocks and 149 in 7 blocks. Shenton Group won a contract to provide a combined heat and power…
Shenton Group Provides Standby Power Solution for Private Rural Property
A private residence in rural West Sussex experiencing regular power cuts required continuous power supplies to the main building, as well as power to a specialised aquarium.
Residential Homes Protected with Power Call Emergency Generator Service
Charged with ensuring the safety and comfort of scores of elderly people, a Hampshire-based care group sought to ensure that the residents throughout its 19 quality care homes did not face potential hazards and discomforts brought about by national grid mains power failure.