Shenton Group News

Backup Generator Solution for Ilona Rose House

Client: Gratte BrothersSector: Mixed-Use Development Location: Soho, London Products/Services 1850kVA generator with MTU engine 75@1m bespoke acoustic enclosure Remote radiator  Interconnecting coolant pipework 2-hour fire-rated inlet and outlet dampeners Forced air ventilation system Remote fill point cabinet utilising Secon-x pipework to the bulk fuel tank 50 meters of flue Background…

Read More

Reliable Backup: Eight Generators Ensuring Resilience

BACKGROUND Being one of the largest online retailers, the project required a reliable and resilient solution to ensure their distribution centre could remain operational in the event of a power outage.  PROJECT OVERVIEW Working closely with the consultant from the initial stages, Shenton Group offered a unique approach to providing…

Read More

CHP Solution for 145 City Road, London

Client: Vital EnergiSector: Residential & Mixed-Use DevelopmentLocation: London Products/ Services 1 x 150kWe bespoke CHP unitDelivery, off-loading and positioningG59 relayG59 application process and witness testing System commissioning Supply of heat and gas metresCHP maintenance contracts BACKGROUND The developer appointed our client Vital Energi to deliver the energy centre plant room for…

Read More

Shenton Group Selected for Financial Company’s London HQ

Overview A global market leader in financial spread betting relocated its headquarters to London.  Reliable continuous power supplies were, of course, a priority for a business operating within the financial sector.  The organisation turned to Shenton Group which provided a synchronised pair of 1250kVA standby generators and further protection in the…

Read More

Bank of Cyprus UK Partners with Shentongroup

Together with all financial organisations, banks must have a reliable continuous power supply solution in place to ensure that all business systems maintain operation in the increasingly likely event of mains power failure.

Read More

Major Air Circuit Breakers Upgrade in London Docklands

Overview When one of the UK’s largest facilities management companies won a prestigious contract to service a large London Docklands office complex, they enlisted shentongroup to manage the maintenance of its standby generator sets.  The project included replacing four Air Circuit Breakers through a coordinated series of building closures.

Read More

Plantronics Secures Power with Shenton’s Integrated System

Overview When a division of electronics giant Plantronics suffered a power outage, the company engaged shentongroup to provide it with a standby generator, supported by a generator maintenance contract.    With the threat of power outages becoming an increased worry for many UK-based organisations, Plantronics’ Wooton Bassett division now…

Read More