The client wanted 2 New 385 kVA Generators installed in separate areas of the site one of which needed the installation of a Hot Air Out Duct section and also a Twin walled Exhaust to the Roof of the Building.

385kVA Generator
385kVA Generator

As part of the project we also assisted in the connection of a number of Starting and BMS controls from the various Life Safety changeover panels positioned around the building. Each Set has been provided with a Power Care 24 Maintenance Contract for a 12 month period managed by our Power Care team. Both required a Load Bank Site Acceptance Test on site to ensure air flow requirements had been met which they had.

One of our highly qualified Project Managers managed this project from start to finish and ensured both Generators were completed on time and to the client’s specification and budget. Another successful Generator installation by shentongroup!