A major university in the Midlands now has backup power thanks to shentongroup.
The client requested a packaged unit so in the future it can be moved to other locations on the site, so that’s exactly what we did. We installed a 220kVA Iveco Generator with a packaged enclosed acoustic canopy which is rated at 85 @1m dB.
It was important the generator could run for prolonged periods with no refuelling required so an integral 1200 litre fuel tank was installed. We also installed a floor Mounted 400 Amp AMF and Generator Control panel.
I am sure you will agree, after looking at the photographs, that this was yet another very professional project that was managed from start to finish by one of our highly experienced and qualified Project Managers.