We at shentongroup have been involved in many projects for student accommodation blocks so when our client asked us to look after this project we knew we could draw upon years of experience to complete it to a very high standard.

generator through istallation for student accommodation
77 kVA Generator midway through installation

Our client required a 77 kVA Generator for their student accommodation block. With a very limited area to work with due to very restrictive access to external openings, we installed a Flue Dilution system to ensure external wall penetrations were kept to a minimum whilst all necessary air-flows were achieved.powersystems-square student accommodation

Our project team, consisting of a highly experienced Project Manager and highly qualified Engineers, took care of everything from start to finish including delivery, offloading, positioning and commissioning.

We don’t just stop at installing Generators, we offer the complete solution so for peace of mind we also included the first years maintenance free of charge to ensure the generator runs to its optimum performance.

flue dilution system for student accommodation block
Flue Dilution system

.

 

 

 