Once it’s clear that CHP is the right solution, how do you get the more technical elements of specification right? And how do you avoid common mistakes to get a high performing and operationally efficient CHP system?

This free white paper is designed for those at the technical specification stage of CHP design, and covers mechanical, electrical and operational considerations including;

  • The guide covers the following topics
  • Design Philosophy
  • Operating Strategy
  • Relationship With Boilers and BMS
  • Electrical Infrastructure
  • G59 embedded generator regulations
  • Spatial Requirements
  • Acoustic Considerations
  • The common pitfalls in CHP design

    Download whitepaper

    I am also interested in a CPD (continuing professional development) on this topic. Please contact me to arrange a suitable date.
    Occasionally we may wish to contact you in the future with technical articles and information about our services. Please tick this box if you do wish to be contacted in the future.

    Subscribe to our mailing list




      I accept that Shenton Group will use the information you provide on this form to keep in touch and to provide updates and marketing