24/7 Emergency Call-Out

Home » Case Studies

Our Case Studies

Proven Power Solutions Across Every Sector…

At Shenton Group, we don’t just promise reliable power – we deliver it. Our sector-specific case studies showcase how our tailored solutions have helped organisations across the UK overcome complex energy challenges, minimise downtime, and achieve operational resilience. From healthcare and data centres to manufacturing and government infrastructure, each story highlights our commitment to engineering excellence, rapid deployment, and long-term support.

Explore real-world examples of how Shenton Group’s expertise in standby power, CHP, and generator rental solutions has made a measurable impact. Whether you’re seeking energy security, compliance, or cost-efficiency, these case studies provide actionable insights and proven outcomes to guide your decision-making.

Browse our case studies to see The Shenton Group Standard in action.

Filter Options

  • Backup Generator Solution for Ilona Rose House

    Client: Gratte BrothersSector: Mixed-Use Development Location: Soho, London Products/Services Background Ilona Rose House, set in the heart of Soho, London, is a 31,0,00sqm new-build project spread over 13 floors, including four below ground. With a build cost of £100m, the development will contain shops, restaurants, bars, offices, residential apartments, a gallery and a nightclub. Shenton Group … Continued

  • Providing Power Continuity to Virgin Media

    The Virgin Media Technology Service Centre, a campus facility in Knowsley, UK, was subject to technical upgrading of its supportive infrastructure to better enhance the power resilience to the site.

    The existing Diesel Rotary Uninterruptible Power Supplies (DRUPS) technology became extremely expensive to maintain, leading to the decision to upgrade the equipment. Shenton Group was once again entrusted with this project due to an ongoing relationship with previous power installations for Virgin Media.

  • Turnkey Generator Solution For Welsh Water

    Along with offering a turnkey project where we would also remove the old equipment, the design we put forward negated the need for rental generators and reduced the amount of cable, which would save the client a quarter of a million pounds. This ultimately leads us to win the project. 

  • Butchers Pet Care Reduces CO2 Emissions & Energy Costs With CHP

    Client: Butchers Pet Care Sector: Industrial – Food & Drink Location: Northampton Products/ Services  BACKGROUND  Butchers Pet Care were keen to reduce operating costs with a carbon-reducing energy solution. After reviewing the options available, Combined Heat and Power (CHP) provided electrical and thermal benefits that no other solution could provide. CHP offered carbon savings coupled with significant … Continued

  • Reliable Backup: Eight Generators Ensuring Resilience

    BACKGROUND Being one of the largest online retailers, the project required a reliable and resilient solution to ensure their distribution centre could remain operational in the event of a power outage.  PROJECT OVERVIEW Working closely with the consultant from the initial stages, Shenton Group offered a unique approach to providing 3MVA of standby power. To … Continued

  • Shenton Group Supplies Ocado with Standby Power Solution

    Client – OcadoLocation: Andover BACKGROUND In February 2019, the Ocado CFC in Andover caught fire and was virtually destroyed. Two years after the fire, Ocado is pleased to confirm that the rebuild of the replacement customer fulfilment centre (“CFC”) continues to proceed at pace and is scheduled to open on time in Autumn 2021. The … Continued

  • CHP Solution Provides University of Exeter with Energy Savings

    Client: Whitehead Building ServicesLocation: Exeter Products/ Services BACKGROUND For many years Exeter university has been growing rapidly, and with growth comes the need for consistent investment into the campus’s infrastructure. With this in mind, East Park was developed to provide further accommodation for undergraduate students. The development consisted of 100 standard bedrooms and 504 en-suite … Continued

  • Royal Mail Gets a Royal Backup Power Solution From Shenton Group

    BACKGROUND As the Royal Mail continue to invest in their infrastructure, Shenton Group were once again called upon to offer a resilient standby power solution to support one of their distribution centres. The project was progressing under tight deadlines, and a well-respected M&E contractor contracted Shenton Group to design, supply and install the generator package … Continued

  • Generator & CHP Package Supports University of Cambridge’s Research Laboratory

    BACKGROUND Project Capella was a £79m research laboratory development for the University of Cambridge. The University wanted a fast-track build, and as a result, some very fast-track methods of construction were required throughout the project. However, as a heavily serviced research laboratory with considerably complex and intricate M&E components, design coordination and collaboration with other … Continued

  • Another Lidl Distribution Centre Backed By Shenton

    BACKGROUND Having worked on many Lidl projects in the past, Shenton Group were again involved in providing the backup power solution for Lidl’s Peterborough distribution centre. Working with the consultant from the early design stages, we helped develop a cost-effective and resilient solution whilst also limiting the footprint required on site. PROJECT OVERVIEW  Shenton Group … Continued