• Shenton Hp Hero

    The UK’s Leading Technical Experts in

    Standby Power, Uninterruptible Power Supplies and Combined Heat & Power Systems

    View our products & services

Providing you with the
most trusted energy solutions
in an unpredictable world

Trusted for over 37 years by public and private organisations, we supply, install and maintain all aspects of Standby Power, Uninterruptible Power Supplies and Combined Heat & Power Systems. From feasibility and design advice, through to integration and commissioning, we provide peace of mind with a turn-key solution.

Generators & UPS

Generators & UPS

Complete turn-key installations for every critical environment

Combined Heat & Power

Combined Heat & Power

Greener cleaner energy, maximising energy savings

Generator Rental

Generator Rental

Generators available for every application.

Power Call

Power Call

Emergency generator callout service

Maintenance & Monitoring

Maintenance & Monitoring

24/7 Maintenance and monitoring contracts throughout the UK

Parts & Consumables

Parts & Consumables

Ready when you need them

Case studies

Back Up Power Supply

Where space and costs are a significant factor, continuous power supplies do not necessarily have to be compromised.

For Klarity Vision, a Peterborough-based professional business and tax solutions specialist, a permanent generator set was unsuitable. The company turned to shentongroup which now provides its Power Call Generator Rental service, guaranteeing that Klarity Vision receives ‘power within the hour’ in the event of mains power failures.

Read full case study   View all case studies

BAE
NHS
H&M
Raf
HSBC
Uea
Why shenton gorup

Why Shenton Group?

Shenton Group's technical ability and dedication sets them apart from the rest. With a reputation in providing quality solutions and installing them in remote and hard to reach places, they secure themselves as a leading supplier.

Learn more about us

Get Started

Already have a CHP or Generator or looking to get one? Request a FREE site survey, and we will send one of our technical team members to your site. Or are you a consultant that would like to brush up on your Generator and CHP technical knowledge to aid your M&E designs? Request a CPD with one of our specialists.

Latest News

Thursday, January 14, 2021
Energy security involves minimising risk by updating or renewing infrastructure, adopting safe and secure technology and being able to switch to another resource.
Friday, December 04, 2020
We have put together the latest news highlighting some of the most talked about issues from an energy and power perspective.
Thursday, November 26, 2020
Data centres use vast amounts of electricity to keep up with the computing power required for even a single data floor, before the infrastructure of the cooling system is even considered, which is why CHP is an attractive option.

Subscribe to our mailing list




    I accept that Shenton Group will use the information you provide on this form to keep in touch and to provide updates and marketing