24/7 Emergency Call-Out

Dark Overlay

Infrastructure &
Utilities

Home » Sectors and Case Studies » Infrastructure & Utilities

Power Continuity for
Infrastructure & Utilities

In infrastructure and utilities, power failure isn’t just disruptive—it can halt essential services, breach regulatory compliance, and impact thousands of customers. Shenton Group delivers robust backup power and CHP solutions that ensure maximum uptime, reduce energy costs, and support sustainability across complex, high-demand environments. Whether you’re managing pumping stations, treatment plants, or remote utility sites, our systems keep operations running smoothly and communities connected.

What’s at Risk Without Reliable Power?

Utility and infrastructure providers face unique challenges when power fails:

  • Regulatory Breaches – Missed compliance targets and costly penalties.
  • Remote Site Vulnerability – Unplanned outages in hard-to-reach areas disrupt essential services.
  • Service Interruption – Pumping stations, treatment plants, and critical networks go offline.
  • Customer Impact – Loss of water, energy, or connectivity leads to complaints and reputational damage.
  • Environmental Pressure – Missed sustainability and emissions targets without CHP optimisation.
  • Operational Downtime – Delays to maintenance, upgrades, and emergency response.


Tailored Power Solutions for Utilities & Infrastructure

We engineer and maintain power systems that meet the demands of this sector:

  • Single & Three Phase Generators from 300kVA to 3200kVA.
  • Generator Hire: Ideal for temporary works, upgrades, and emergency response.
  • CHP Systems: Comprehensive maintenance that ensures ultimate uptime, greener energy with reduced heat and electricity costs.
  • Powercall: 24/7 emergency generator rental
  • Prime Power Installations: Long-term solutions for remote or off-grid sites.
  • Full Compliance Support: Designed to meet emissions reduction schemes and regulatory standards.

Proven Success in Infrastructure & Utilities

We’ve supported major utility providers and infrastructure projects with reliable power:

  • National Generator Maintenance Support for Gas Network Provider
    Provided ongoing generator maintenance to ensure uninterrupted power for critical gas network operations. Read full case study
  • Turnkey Generator Solution for Welsh Water
    Designed and implemented a complete generator system for a major pumping station, ensuring compliance and reliability. Read full case study
  • DEFRA-Compliant Fuel Pipework for Thames Water’s New Diesel Generators
    Ensured compliance and safety for fuel systems supporting critical water infrastructure.
    Read full case study

Why Infrastructure Leaders Trust Shenton Group

  • Decades of Proven Expertise
    Trusted power solutions for utilities, infrastructure, and critical services.
  • Certified Quality & Compliance
    NICEIC and ISO-approved installations, meeting DEFRA and emissions standards.
  • End-to-End Resilience
    Generators, UPS, CHP, battery storage – plus 24/7 emergency cover via Power Call.
  • Rapid Nationwide Response
    Fast deployment and full UK coverage with sector-specific technical support.
  • Sustainable & Cost-Efficient Solutions
    CHP optimisation and battery storage to cut carbon and energy costs
  • Advanced Monitoring & SLA Protection
    24/7 remote insights, flexible service levels, and guaranteed SLA compliance.

Our Latest News

  • Fri, September 30th, 2016 – Project Manager, Infrastructure Company

    I wanted to thank you for your collaborative and reactive approach throughout the ******* Generator Controller replacement project.  I’d be grateful if you could also pass on myself and Peter’s thanks to the guys in the field who went out of their way to be flexible and help us fit in with ******* requirements and other … Continued
  • Tues, January 20, 2015 – Senior Electrical Engineer, University

    Tues, January 20, 2015 – Senior Electrical Engineer, University Just to say the presenter Richard, was knowledgeable, humorous and pitched at the right pace. This was the best CPD I have attended in a few years.
  • Fri, April 26, 2013 – Home Owner, Private House

    Fri, April 26, 2013 – Home Owner, Private House You are very kind as I have recieved the most delicious looking bottle of red wine in the smartest presentation case along with the most useful accessories! Thank you so much to you and everyone at shentongroup, I could not be more grateful. We will drink … Continued
  • Tue, November 08, 2011 – Principle Oil & Development Engineer

    Tue, November 08, 2011 – Principle Oil & Development Engineer shentongroup’s generators are robust for longevity, large enough to run the degasification and ancillary equipment but still maintain low noise levels. They have an excellent reputation and ability to think outside the box.
  • Fri, April 26, 2013 – Facilities Manager, Investment Service Provider

    Fri, April 26, 2013 – Facilities Manager, Investment Service Provider Thanks for setting this up I really appreciate the help and professional manner in which this was handled, also your engineer was first class and thanks for not charging us. Thanks.
  • Tue, December 04, 2012 – Branch Manager at Electrical Reseller

    Tue, December 04, 2012 – Branch Manager at Electrical Reseller Compared to FG Wilson, you guys are in a different league.
  • Mon, January 19, 2015 – Head of IT Infrastructure, University

    Mon, January 19, 2015 – Head of IT Infrastructure, University Echoing ****** comments, many thanks indeed to all those involved in completing this work very professionally. We are very happy with the outcome and Shenton’s approach to working with us.
  • Thu, August 29, 2013 – Royal Airforce Base

    Thu, August 29, 2013 – Royal Airforce Base Hi Marcus, just wanted to drop you a quick email to let you know I was really impressed with your guys yesterday.  They all worked like Trojans to get the old system out and the new units in place, the weather was unseasonably warm for Scotland and … Continued
  • Tue, May 07, 2013 – Quality Manager, FM Contractor Company

    Tue, May 07, 2013 – Quality Manager, FM Contractor Company Thanks for being so efficient and making the process very smooth. We are very grateful and will look to use you in the future when required.
  • Fri, April 26, 2013 – Civil Contingencies Officer, Council

    Fri, April 26, 2013 – Civil Contingencies Officer, Council The installation was successfully completed today, thanks to all concerned for your help, support, coorporation and coordination with this project.
  • Wed, October 21, 2015 – Project Manager, Building Consultants

    Wed, October 21, 2015 – Project Manager, Building Consultants Grant and Mark have been a pleasure to deal with thus far with this project, and I’ll personally make sure that you guys are invited to work with us on any and all generator projects that come up. Thanks again.
  • Tues, May 12, 2015 – Managing Director, Leading UK Data Centre

    Tues, May 12, 2015 – Managing Director, Leading UK Data Centre Honestly it has been a pleasure working with Shenton. We have had several ‘bad ones’ in other contracts throughout our build but your guys have been on top form. We will be using you again for additional generator sets and maintenance in the future.

Secure Your Power, Protect Your Service

Let’s design a power solution that keeps your infrastructure running, without interruption. Speak to the UK’s leading technical experts today.