24/7 Emergency Call-Out

Dark Overlay

Manufacturing

Home » Sectors and Case Studies » Manufacturing

Power Continuity for Manufacturing

Reliable Power, No Downtime, No Crisis

In manufacturing, power loss isn’t just inconvenient it halts production, damages equipment, and delays delivery. UK and EU manufacturers are estimated to lose over £80 billion a year to unplanned downtime, and every minute offline compounds the cost in wasted materials, missed deadlines, and idle labour. 

That’s why Shenton Group designs, installs and maintains standby and prime power generators from 20kVA to 2000+ kVA, alongside Combined Heat and Power (CHP) systems that deliver both uptime assurance and measurable energy savings. 

Whether you’re producing food, pharmaceuticals, automotive components, or precision-engineered parts, our solutions keep production running, reduce heating and electricity costs, and support regulatory compliance. Trusted by manufacturers across the UK since [year, pull from About/History page], we deliver power continuity that keeps your business competitive, efficient, and ready to meet demand. 

What Happens When the Power Stops?

Without reliable power, manufacturing businesses face serious consequences:

  • Production Downtime: Missed deadlines, idle staff, and lost revenue.
  • Equipment Damage: Sudden shutdowns can harm sensitive machinery and disrupt calibration.
  • Supply Chain Disruption: Delays ripple through logistics and partner networks.
  • Regulatory & Compliance Risk: For food and pharmaceutical manufacturers, power loss can mean batch loss, temperature excursions, and GMP or traceability failures. 
  • Loss of reputation: Potentially losing future business
  • Energy Inefficiency: Rising costs without CHP optimisation.
  • Lost Competitive Edge: Inability to meet demand or scale reliably.

Engineered Power Solutions for Manufacturing

We design and maintain power systems that keep your production line moving:

  • Generator Systems: Backup power for grid outages, sized to your production load (typically 20kVA–2000kVA+ for manufacturing sites), delivering continuous power for critical operations.
  • Generator Hire: For planned works like power system upgrades or emergency callouts, we have a fleet of generators for hire, ready to respond
  • CHP Maintenance: Optimising the run time of your CHP’s heat and electricity generation for cost savings.
  • Remote Monitoring: Real-time performance tracking and fault alerts. We monitor your power system remotely and can often predict and fix issues before they become a problem.
  • Maintenance & Support: Proactive servicing to prevent downtime. Plus 24/7 engineer call-out support.
  • Scalable Installations: Tailored solutions for single sites or multi-location operations.

Power Continuity for Food & Pharmaceutical Manufacturing 

Food and pharmaceutical manufacturers face some of the strictest continuity requirements of any sector. A power failure doesn’t just stop the line it can compromise cold-chain integrity, void batch records, and put GMP compliance at risk. 

Our standby and hire generator solutions are specified around your critical loads refrigeration, cleanroom environments, process control systems to keep temperature-sensitive production and storage running through an outage. Combined with remote monitoring and rapid-response maintenance, we help food and pharma manufacturers protect product integrity, meet regulatory obligations, and avoid the cost of a lost batch. 

What Size Generator Does a Manufacturing Facility Need?

Sizing depends on your critical load, not just total site demand. As a guide: 

  • Small production units / single lines: 20–100kVA 
  • Mid-size manufacturing sites: 100–500kVA 
  • Large or multi-line facilities: 500kVA–2000kVA+ 
  • Multi-site or high-availability operations: Multiple synchronised units or containerised solutions 

Our engineers assess your load profile, essential vs. non-essential circuits, and future capacity needs before recommending a system — avoiding the common and costly mistake of under- or over-sizing. 

F&Qs

Ready to Protect Your Manufacturing Operations?

Speak to our experts today to discuss tailored power solutions for your facility.

Contact Us

Our Latest News

  • Fri, July 22, 2011 – Contracts Manager – Telecomm FM provider.

    Fri, July 22, 2011 – Contracts Manager – Telecomm FM provider. We went out to tender but chose shentongroup as we were particularly impressed with the fact they immediately understood what was required and took the time to understand how we wanted the contract to work. The company has national coverage and offers far more … Continued
  • Wed, August 31, 2011 – 10:10:55 – General Manager – Hotel Group

    Wed, August 31, 2011 – 10:10:55 – General Manager – Hotel Group The major powercut focused our minds on the need for additional power support ….
  • Tue, November 08, 2011 – Principle Oil & Development Engineer

    Tue, November 08, 2011 – Principle Oil & Development Engineer shentongroup’s generators are robust for longevity, large enough to run the degasification and ancillary equipment but still maintain low noise levels. They have an excellent reputation and ability to think outside the box.
  • Wed, January 14, 2015 – Owner, Large Farm

    Wed, January 14, 2015 – Owner, Large Farm All I want to add is that we were highly impressed with the professionalism of your team in dealing with the installation. It really is a magnificent piece of kit! (And it’s got a Perkins Diesel engine – the sound of which I’m very familiar with!) Many thanks … Continued
  • Wed, March 15, 2017 – Systems Manager, British University

    Brilliant Stuff Stephanie and you are welcome, I must say you guys have always helped us in a crisis and that counts for a lot… …As usual let me known when you have a team ready for the Hawkeye installation.
  • Mon, June 20, 2016 – Regional Manager, Mechanical and Electrical Company

    Mon, June 20, 2016 – Regional Manager, Mechanical and Electrical Company As per our email exchange on Friday, many thanks once again for sorting out this difficult situation, once again shentongroup have demonstrated excellent customer care in what was a difficult situation for us all.  We have a few projects starting to come on stream in … Continued
  • Wed, October 12, 2016 – Electrical Site Foreman, Building Services Company

    May I take this opportunity to thank you and your site team for the excellent service you have provided over the past 3 months at the **********. Special praise needs to go to Tom & Stuart who have shown true dedication and professionalism in delivering a successful project which at times has been a challenge!! … Continued
  • Ian Hedges – Briggs & Forrester

    Shenton Group provide us with excellent estimating support on many projects, always returning on time or advising up-front if it’s something they can’t offer, which is invaluable.Their professional and pro-active approach has cemented them as one of our go to providers for generator and UPS systems.
  • Sun, July 31, 2013 – Construction Project Manager for UK and Ireland at Large Retail Property Investment Company

    Wed, July 31, 2013 – Construction Project Manager for UK and Ireland at Large Retail Property Investment Company I have had the chance to review the installation works on the new SO generator; and wanted to say that I am happy with the standard of works. Walking the installation, everything looks to be good and … Continued
  • Tue, November 08, 2011 – Group Estates Surveyor – Healthcare Group

    Tue, November 08, 2011 – Group Estates Surveyor – Healthcare Group Power Call is unique and the only company that serves our niche market.
  • Thu, June 30, 2011 – Electrical Design Engineer at the University of East Anglia

    Thu, June 30, 2011 – Electrical Design Engineer at the University of East Anglia We have received excellent service from shentongroup, which was able to advise us on the best possible way of ensuring that all our essential equipment could continue functioning during powercuts.
  • Wed, October 12, 2011 – Manager – Health and Fitness Club

    Wed, October 12, 2011 – Manager – Health and Fitness Club When due to our increasing growth we needed to open a second Health and Fitness centre, shentongroup provided us with a clean…

Secure Your Power, Protect Your Production

Let’s design a power solution that keeps your production line moving, without interruption. Speak to the UK’s leading technical experts today.