24/7 Emergency Call-Out

Dark Overlay

Financial &
Commercial

Home » Sectors and Case Studies » Financial & Commercial

Reliable Power Solutions for Financial & Commercial Sectors

In financial and commercial environments, power failure isn’t just inconvenient – it’s costly. From lost transactions and data breaches to reputational damage and regulatory non-compliance, the risks are real. Shenton Group delivers tailored generator and UPS systems that ensure uninterrupted operations, protect sensitive data, and meet the highest industry standards. Trusted by banks, retail chains, and office complexes across the UK, we keep your business powered, secure, and compliant – no matter what.

What’s at Stake Without Reliable Power?

  • Operational Disruption: Staff downtime, customer service impact.
  • Financial Loss: Missed transactions, halted trading, lost revenue.
  • Data Vulnerability: Risk of corruption or loss during outages.
  • Reputational Damage: Clients lose trust when systems go down.
  • Compliance Failures: Breaches of FCA, GDPR, or ISO standards.

Power Systems Built for Business Continuity

How we support you:

  • Generator systems for critical infrastructure
  • UPS integration for seamless failover
  • Remote monitoring and maintenance
  • Scalable solutions for multi-site operations
  • Compliance-ready installations

Our Latest News

  • Backup Generator Solution for Ilona Rose House

    Client: Gratte BrothersSector: Mixed-Use Development Location: Soho, London Products/Services Background Ilona Rose House, set in the heart of Soho, London, is a 31,0,00sqm new-build project spread over 13 floors, including four below ground. With a build cost of £100m, the development will contain shops, restaurants, bars, offices, residential apartments, a gallery and a nightclub. Shenton Group … Continued

  • Reliable Backup: Eight Generators Ensuring Resilience

    BACKGROUND Being one of the largest online retailers, the project required a reliable and resilient solution to ensure their distribution centre could remain operational in the event of a power outage.  PROJECT OVERVIEW Working closely with the consultant from the initial stages, Shenton Group offered a unique approach to providing 3MVA of standby power. To … Continued

  • CHP Solution for 145 City Road, London

    Client: Vital EnergiSector: Residential & Mixed-Use DevelopmentLocation: London Products/ Services BACKGROUND The developer appointed our client Vital Energi to deliver the energy centre plant room for this prestigious development. There were very specific emissions and acoustic performance targets that had to be met regarding the proposed CHP instalation, whilst working within the constraints of a … Continued

  • Shenton Group Selected for Financial Company’s London HQ

    Overview A global market leader in financial spread betting relocated its headquarters to London.  Reliable continuous power supplies were, of course, a priority for a business operating within the financial sector.  The organisation turned to Shenton Group which provided a synchronised pair of 1250kVA standby generators and further protection in the form of a comprehensive maintenance … Continued

  • Major Air Circuit Breakers Upgrade in London Docklands

    Overview When one of the UK’s largest facilities management companies won a prestigious contract to service a large London Docklands office complex, they enlisted shentongroup to manage the maintenance of its standby generator sets.  The project included replacing four Air Circuit Breakers through a coordinated series of building closures. The Problem shentongroup Director, Darren Meek, … Continued

  • Plantronics Secures Power with Shenton’s Integrated System

    Overview When a division of electronics giant Plantronics suffered a power outage, the company engaged shentongroup to provide it with a standby generator, supported by a generator maintenance contract.    With the threat of power outages becoming an increased worry for many UK-based organisations, Plantronics’ Wooton Bassett division now has the assurance that their business … Continued

  • Sun, July 31, 2013 – Construction Project Manager for UK and Ireland at Large Retail Property Investment Company

    Wed, July 31, 2013 – Construction Project Manager for UK and Ireland at Large Retail Property Investment Company I have had the chance to review the installation works on the new SO generator; and wanted to say that I am happy with the standard of works. Walking the installation, everything looks to be good and … Continued
  • Tue, December 04, 2012 – Branch Manager at Electrical Reseller

    Tue, December 04, 2012 – Branch Manager at Electrical Reseller Compared to FG Wilson, you guys are in a different league.
  • Wed, March 15, 2017 – Systems Manager, British University

    Brilliant Stuff Stephanie and you are welcome, I must say you guys have always helped us in a crisis and that counts for a lot… …As usual let me known when you have a team ready for the Hawkeye installation.
  • Fri, April 26, 2013 – Construction Project Manager, Retail Investments Ltd

    Fri, April 26, 2013 – Construction Project Manager, Retail Investments Ltd The service provided by shentongroup and their onsite engineers / fitters was very good. From the initial tender interview through VE and onto fitting was well actioned.
  • Tues, October 28, 2014 – Manager, Important Historical Building

    Tues, October 28, 2014 – Manager, Important Historical Building I’d would like to thank you and the Shenton Group for acting so quickly in removing the generator from site. This has enabled the restoration works at ********* to take place and with a few days grace so we are all delighted. I understand that the … Continued
  • Wed, August 31, 2011 – 10:10:55 – General Manager – Hotel Group

    Wed, August 31, 2011 – 10:10:55 – General Manager – Hotel Group The major powercut focused our minds on the need for additional power support ….
  • Tue, December 04, 2012 – Senior Service Manager, Manufacturing Company

    Tue, December 04, 2012 – Senior Service Manager, Manufacturing Company Thank you very much for your help and organization last week.
  • Engineering Services Manager – Healthcare Company

    Your Engineer was on time and he called me directly for accurate location details. He was well mannered, informative and didn’t waste any time so he was done collecting data and completed his minor service works quickly so allowing me to undertake the monthly test without too long a delay. All in all this was … Continued
  • Wed, January 14, 2015 – Owner, Large Farm

    Wed, January 14, 2015 – Owner, Large Farm All I want to add is that we were highly impressed with the professionalism of your team in dealing with the installation. It really is a magnificent piece of kit! (And it’s got a Perkins Diesel engine – the sound of which I’m very familiar with!) Many thanks … Continued
  • Tue, September 17, 2013 – Test House Engineer at Air & Sea Based Countermeasure Design and Manufacturing Company

    Tue, September 17, 2013 – Test House Engineer at Air & Sea Based Countermeasure Design and Manufacturing Company Would you please pass on my sincere thanks to all at shenton for their help over the years, and particularly to Tom for all the times he has had to endure the lousy weather up here, the … Continued
  • Wed, November 23, 2016 – Project Manager, M&E Contractor

    Good to put a face to the name yesterday and well done on the successful commissioning of the CHP at *******************. Firstly, I want to say how excellent Sean your engineer was and the due-diligence and proactive approach really is a credit to your company and a breath of fresh air compared to how these … Continued
  • Facilities Manager, Risk Management Experts

    Hi Julie, Thank you for your help today.  This is the first time we’ve had a problem with our generator and I was reassured by the quick response.

Ready to Protect Your Business?

Speak to our power continuity experts today. Let’s design a solution that keeps your business running—without interruption.