24/7 Emergency Call-Out

Dark Overlay

Financial &
Commercial

Home » Sectors and Case Studies » Financial & Commercial

Reliable Power Solutions for Financial & Commercial Sectors

In financial and commercial environments, power failure isn’t just inconvenient – it’s costly. From lost transactions and data breaches to reputational damage and regulatory non-compliance, the risks are real. Shenton Group delivers tailored generator and UPS systems that ensure uninterrupted operations, protect sensitive data, and meet the highest industry standards. Trusted by banks, retail chains, and office complexes across the UK, we keep your business powered, secure, and compliant – no matter what.

What’s at Stake Without Reliable Power?

  • Operational Disruption: Staff downtime, customer service impact.
  • Financial Loss: Missed transactions, halted trading, lost revenue.
  • Data Vulnerability: Risk of corruption or loss during outages.
  • Reputational Damage: Clients lose trust when systems go down.
  • Compliance Failures: Breaches of FCA, GDPR, or ISO standards.

Power Systems Built for Business Continuity

How we support you:

  • Generator systems for critical infrastructure
  • UPS integration for seamless failover
  • Remote monitoring and maintenance
  • Scalable solutions for multi-site operations
  • Compliance-ready installations

Our Latest News

  • Backup Generator Solution for Ilona Rose House

    Client: Gratte BrothersSector: Mixed-Use Development Location: Soho, London Products/Services Background Ilona Rose House, set in the heart of Soho, London, is a 31,0,00sqm new-build project spread over 13 floors, including four below ground. With a build cost of £100m, the development will contain shops, restaurants, bars, offices, residential apartments, a gallery and a nightclub. Shenton Group … Continued

  • Reliable Backup: Eight Generators Ensuring Resilience

    BACKGROUND Being one of the largest online retailers, the project required a reliable and resilient solution to ensure their distribution centre could remain operational in the event of a power outage.  PROJECT OVERVIEW Working closely with the consultant from the initial stages, Shenton Group offered a unique approach to providing 3MVA of standby power. To … Continued

  • CHP Solution for 145 City Road, London

    Client: Vital EnergiSector: Residential & Mixed-Use DevelopmentLocation: London Products/ Services BACKGROUND The developer appointed our client Vital Energi to deliver the energy centre plant room for this prestigious development. There were very specific emissions and acoustic performance targets that had to be met regarding the proposed CHP instalation, whilst working within the constraints of a … Continued

  • Shenton Group Selected for Financial Company’s London HQ

    Overview A global market leader in financial spread betting relocated its headquarters to London.  Reliable continuous power supplies were, of course, a priority for a business operating within the financial sector.  The organisation turned to Shenton Group which provided a synchronised pair of 1250kVA standby generators and further protection in the form of a comprehensive maintenance … Continued

  • Major Air Circuit Breakers Upgrade in London Docklands

    Overview When one of the UK’s largest facilities management companies won a prestigious contract to service a large London Docklands office complex, they enlisted shentongroup to manage the maintenance of its standby generator sets.  The project included replacing four Air Circuit Breakers through a coordinated series of building closures. The Problem shentongroup Director, Darren Meek, … Continued

  • Plantronics Secures Power with Shenton’s Integrated System

    Overview When a division of electronics giant Plantronics suffered a power outage, the company engaged shentongroup to provide it with a standby generator, supported by a generator maintenance contract.    With the threat of power outages becoming an increased worry for many UK-based organisations, Plantronics’ Wooton Bassett division now has the assurance that their business … Continued

  • S

    Sat, October 01, 2011 – IT Manager, Lift Manufacturers

    Sat, October 01, 2011 – IT Manager, Lift Manufacturers The installation of the air conditioning was completed on time and to our complete satisfaction.
  • F

    Fri, June 10, 2016 – Mechanical Supervisor, Engineering Services Company

    Fri, June 10, 2016 – Mechanical Supervisor, Engineering Services Company Thank you Julie, appreciate your team’s efforts and attention to detail.
  • T

    Tue, July 30, 2013 – Service Sales Engineer, Contract Reseller Company

    Tue, July 30, 2013 – Service Sales Engineer, Contract Reseller Company Our Client has emailed – he wants me to pass on a big thank you to James and everyone else involved in the Gene hire over the last week.
  • A

    Alex Robinson – AD Plant Manager

    I have found Shenton Group to be a thoroughly professional organisation. Running an AD plant is a 24/7 operation, with constant oversight required. However, even though the CHPs are one of the most critical parts of the AD plant, I have no concerns about their operation, due to the efficiency of the support service provided.
  • T

    Tue, November 08, 2011 – Engineer – Insurance Company

    Tue, November 08, 2011 – Engineer – Insurance Company It is very helpful to have an organisation that can provide us with an integrated service that combines the supply of standby generators with maintenance.  
  • M

    Mon, February 04, 2013 – Projects Manager, Modular Solutions

    Mon, February 04, 2013 – Projects Manager, Modular Solutions I can confirm all went very very well – client very pleased. Well done to James Norman who managed excellently without a hitch, communicating well throughout
  • F

    Fri, January 04, 2013 – Business Critical Contracts Manager, FM Contractor

    Fri, January 04, 2013 – Business Critical Contracts Manager, FM Contractor Hi Lucy. Just thought I would drop you an email to say a huge TA…….
  • W

    Wed, February 03, 2016 – Solutions Architect, Major Energy Management Company

    Wed, February 03, 2016 – Solutions Architect, Major Energy Management Company Roland, you are an absolute star – I’ll have a read through all this but I cannot thank you enough for your efforts – I am truly grateful… Thanks again and I’ll give this a read through – but you are the best!
  • T

    Thu, June 30, 2011 – Electrical Design Engineer at the University of East Anglia

    Thu, June 30, 2011 – Electrical Design Engineer at the University of East Anglia We have received excellent service from shentongroup, which was able to advise us on the best possible way of ensuring that all our essential equipment could continue functioning during powercuts.
  • T

    Tues, January 05, 2016 – Electrical Engineer, Consulting Engineers

    Tues, January 05, 2016 – Electrical Engineer, Consulting Engineers Happy new year to you and many thanks for sending the CPD certificates. Please pass on our appreciation to Richard for what was a truly informative and beneficial CPD seminar.
  • O

    Owner – Radio Station

    I can’t thank you and your team enough for your help with the generator over the weekend. It was the one single thing that I could worry about the least (apart from where to find the fuel gauge!).  It was easy to deal with you, the generator was delivered on time, a lovely piece of … Continued
  • B

    Building Service Manager – Large M&E Company

    James, today’s training went well. Please let your mangers know Alex continued to be very thorough and professional when carrying out his work.

Ready to Protect Your Business?

Speak to our power continuity experts today. Let’s design a solution that keeps your business running—without interruption.