Reliable Power Solutions for Residential Developments

From apartment complexes to large housing developments, residents expect uninterrupted power for comfort, safety, and connectivity. Power failures can lead to inconvenience, reputational damage for developers, and even compliance risks. Shenton Group ensures residential sites remain operational around the clock, having delivered life-safety and backup power solutions for major London mixed-use developments including Marble Arch Place, Ilona Rose House and 145 City Road. 

Why Backup Power is Critical for Life Safety

Residential developments and other buildings such as hotels must have adequate backup power – it’s not just a convenience, it’s a legal and safety requirement. In the event of a power outage:

  • Emergency Lighting must remain operational to ensure safe evacuation routes.
  • Lifts and Accessibility Systems must function for vulnerable residents and guests.
  • Fire Safety Systems must stay powered to protect lives.
  • Security Systems such as CCTV and alarms must continue to operate.

Without these measures, compliance is compromised, and the safety of residents and guests is at risk.

Standby Generators, UPS Systems & Battery Storage

Our solutions include:

  • Standby Generators – Ensure power continuity during outages.
  • Generator Hire – Temporary power for planned outages or emergencies
  • Uninterruptible Power Supply (UPS) – Ensures that there is no break in power, providing seamless protection for critical systems.
  • Battery Storage Solutions – Store energy for instant backup and support sustainability goals.
  • Power Call Emergency Generator Hire – Rapid response for urgent requirements.

Battery storage adds an extra layer of resilience, enabling residential sites to store renewable energy, reduce reliance on the grid, and maintain uptime during transitions or outages.

CHP Maintenance and Efficiency

Combined Heat and Power (CHP) systems generate heat and electricity simultaneously, making them ideal for large residential sites and hotels with high hot water demand. CHP can reduce carbon emissions by up to 30%, cut energy costs, and help meet sustainability targets.

At Shenton Group, we maintain and optimise CHP systems to ensure they deliver maximum efficiency and ROI – helping residential developments and similar achieve greener energy and lower bills without compromising reliability.

What Happens When the Power Stops?

Without reliable power, residential developments face serious consequences:

  • Resident Disruption – Loss of heating, lighting, and essential services.
  • Life Safety Risks – Residents and guests could become trapped in lifts or stairwells during an outage.
  • Security Risks – CCTV, alarms, and access control systems fail, compromising safety.
  • Reputational Damage – Complaints and loss of trust from residents and stakeholders.
  • Energy Inefficiency – Rising costs without CHP optimisation and smart energy solutions.
  • Reduced Resilience – Inability to meet sustainability and compliance targets.

Power for Mixed-Use & Large-Scale Residential Developments

Large residential and mixed-use schemes carry particular complexity worth naming explicitly — multiple building uses on one site, phased occupation, and life-safety obligations that apply from the moment residents move in:

  • Marble Arch Place, London — We designed, supplied and installed the life safety and backup power solution for this new mixed-use development on Bayswater Road, Marylebone. 
  • Ilona Rose House, Soho — A £100m, 31,000sqm development spanning 13 floors, including four below ground, combining shops, restaurants, bars, offices, residential apartments, a gallery and a nightclub — a genuinely complex mix of life-safety and operational power requirements under one roof. 
  • 145 City Road, London — Delivered to strict emissions and acoustic performance targets for a residential and mixed-use development, working within the design constraints of an energy centre plant room. 

F&Qs

Ready to Protect Your Residential Development?
Speak to our experts today to discuss tailored power solutions for your site.

Contact Us

Our Latest News

  • Wed, October 12, 2011 – Manager – Health and Fitness Club

    Wed, October 12, 2011 – Manager – Health and Fitness Club When due to our increasing growth we needed to open a second Health and Fitness centre, shentongroup provided us with a clean…
  • Alex Robinson – AD Plant Manager

    I have found Shenton Group to be a thoroughly professional organisation. Running an AD plant is a 24/7 operation, with constant oversight required. However, even though the CHPs are one of the most critical parts of the AD plant, I have no concerns about their operation, due to the efficiency of the support service provided.
  • Fri, April 26, 2013 – Electrical Contractor

    Fri, April 26, 2013 – Electrical Contractor We are very happy with your service and have no suggestions for improvement everything went as planned with no hiccups. Thank you for your efforts.
  • Fri, June 6, 2014 – Senior Project Manager

    Fri, June 6, 2014 – Senior Project Manager Thank you for the email I must say that your engineer on Tuesday was great and all items were concluded on the day
  • Tues, January 05, 2016 – Electrical Engineer, Consulting Engineers

    Tues, January 05, 2016 – Electrical Engineer, Consulting Engineers Happy new year to you and many thanks for sending the CPD certificates. Please pass on our appreciation to Richard for what was a truly informative and beneficial CPD seminar.
  • Tue, November 08, 2011 – Principle Oil & Development Engineer

    Tue, November 08, 2011 – Principle Oil & Development Engineer shentongroup’s generators are robust for longevity, large enough to run the degasification and ancillary equipment but still maintain low noise levels. They have an excellent reputation and ability to think outside the box.
  • Wed, October 14, 2015 – Electrical Foreman, Building Services Company

    Wed, October 14, 2015 – Electrical Foreman, Building Services Company Many thanks for all of your efforts over the past few days.  Is it possible to pass on my thanks to your site team for delivering another successful project?  We have received positive feedback from ********** for all of the work that was carried out, it was … Continued
  • Wed, July 06, 2011 – FM Manager – Telecomm Service Provider

    Wed, July 06, 2011 – FM Manager – Telecomm Service Provider The service provided by shentongroup’s has been first class.
  • Engineer – Consulting Company

    Thank you to those involved in arranging the CPD carried out at our office yesterday. We found this CPD on CHPs to be very informative, and the presenter Marcus Dodswoth was very knowledgeable and approached the CPD with great professionalism and enthusiasm.
  • Fri, June 13, 2014 – Financial Director of Award winning Butcher

    Fri, June 13, 2014 – Financial Director of Award winning Butcher It’s been a pleasure working with your company and should you wish to use as a reference site in future, please don’t hesitate to contact us.
  • Thu, August 29, 2013 – Royal Airforce Base

    Thu, August 29, 2013 – Royal Airforce Base Hi Marcus, just wanted to drop you a quick email to let you know I was really impressed with your guys yesterday.  They all worked like Trojans to get the old system out and the new units in place, the weather was unseasonably warm for Scotland and … Continued
  • Engineering Services Manager – Healthcare Company

    Your Engineer was on time and he called me directly for accurate location details. He was well mannered, informative and didn’t waste any time so he was done collecting data and completed his minor service works quickly so allowing me to undertake the monthly test without too long a delay. All in all this was … Continued