24/7 Emergency Call-Out

Dark Overlay

Residential

Home » Sectors and Case Studies » Residential

Reliable Power Solutions for Residential Developments

From apartment complexes to large housing developments, residents expect uninterrupted power for comfort, safety, and connectivity. Power failures can lead to inconvenience, reputational damage for developers, and even compliance risks. Shenton Group ensures residential sites remain operational around the clock with tailored power solutions.

Why Backup Power is Critical for Life Safety

Residential developments and other buildings such as hotels must have adequate backup power – it’s not just a convenience, it’s a legal and safety requirement. In the event of a power outage:

  • Emergency Lighting must remain operational to ensure safe evacuation routes.
  • Lifts and Accessibility Systems must function for vulnerable residents and guests.
  • Fire Safety Systems must stay powered to protect lives.
  • Security Systems such as CCTV and alarms must continue to operate.

Without these measures, compliance is compromised, and the safety of residents and guests is at risk.

Standby Generators, UPS Systems & Battery Storage

Our solutions include:

  • Standby Generators – Ensure power continuity during outages.
  • Generator Hire – Temporary power for planned outages or emergencies
  • Uninterruptible Power Supply (UPS) – Ensures that there is no break in power, providing seamless protection for critical systems.
  • Battery Storage Solutions – Store energy for instant backup and support sustainability goals.
  • Power Call Emergency Generator Hire – Rapid response for urgent requirements.

Battery storage adds an extra layer of resilience, enabling residential sites to store renewable energy, reduce reliance on the grid, and maintain uptime during transitions or outages.

CHP Maintenance and Efficiency

Combined Heat and Power (CHP) systems generate heat and electricity simultaneously, making them ideal for large residential sites and hotels with high hot water demand. CHP can reduce carbon emissions by up to 30%, cut energy costs, and help meet sustainability targets.

At Shenton Group, we maintain and optimise CHP systems to ensure they deliver maximum efficiency and ROI – helping residential developments and similar achieve greener energy and lower bills without compromising reliability.

What Happens When the Power Stops?

Without reliable power, residential developments face serious consequences:

  • Resident Disruption – Loss of heating, lighting, and essential services.
  • Life Safety Risks – Residents and guests could become trapped in lifts or stairwells during an outage.
  • Security Risks – CCTV, alarms, and access control systems fail, compromising safety.
  • Reputational Damage – Complaints and loss of trust from residents and stakeholders.
  • Energy Inefficiency – Rising costs without CHP optimisation and smart energy solutions.
  • Reduced Resilience – Inability to meet sustainability and compliance targets.

Ready to Protect Your Residential Development?
Speak to our experts today to discuss tailored power solutions for your site.

Contact Us

Our Latest News

  • Tue, November 08, 2011 – Contracts Engineer – Electrical Utilities Company

    Tue, November 08, 2011 – Contracts Engineer – Electrical Utilities Company Over the years we have received excellent service from shentongroup and so I didn’t hesitate to contact them….
  • Tue, October 16, 2012 – Electrical Reseller

    Tue, October 16, 2012 – Electrical Reseller When I have a tricky job that needs doing I call shentongroup.
  • Sat, October 01, 2011 – IT Manager, Lift Manufacturers

    Sat, October 01, 2011 – IT Manager, Lift Manufacturers The installation of the air conditioning was completed on time and to our complete satisfaction.
  • Owner – Radio Station

    I can’t thank you and your team enough for your help with the generator over the weekend. It was the one single thing that I could worry about the least (apart from where to find the fuel gauge!).  It was easy to deal with you, the generator was delivered on time, a lovely piece of … Continued
  • Fri, April 26, 2013 – Facilities Maintenance Contract Manager, County Council

    Fri, April 26, 2013 – Facilities Maintenance Contract Manager, County Council Can you please give my thanks to the shentongroup engineers for successfully completing the generator panel modifications and testing of the system, I would like to thank Paul in particular for coping with the challenging situation under pressure, the shentongroup engineers performed excellently and … Continued
  • Tue, November 08, 2011 – Engineer – Insurance Company

    Tue, November 08, 2011 – Engineer – Insurance Company It is very helpful to have an organisation that can provide us with an integrated service that combines the supply of standby generators with maintenance.  
  • Mon, November 30, 2015 – Project Manager, Building Services Company

    Mon, November 30, 2015 – Project Manager, Building Services Company Can you please thank all you team for delivering this project yesterday to a successful conclusion. Our client and myself really appreciate all the efforts put in to this project.
  • Director of Property, Leading Healthcare Provider

    I am the Director of Property for **********, operating *** residential nursing homes across the UK. For around six years, Power Call has provided outstanding emergency generator support, now covering over 80 of our homes, with 30 more planned next year. Their service is exceptional—reliable, responsive, and consistently exceeding expectations, regularly delivering, installing, and commissioning … Continued
  • Fri, July 25, 2014 – Tyre Specialists

    Fri, July 25, 2014 – Tyre Specialists Very happy with your company, we have a lot of power outages where we are and your generators have never failed to start, been excellent and the service is good. Don’t worry I would never think of going anywhere else when other project arise.
  • Thurs, August 06, 2015 – Electrical Engineer, Consultant Company

    Thurs, August 06, 2015 – Electrical Engineer, Consultant Company Thanks. I cannot speak highly enough of both [CPD] presentations from Richard.
  • Fri, April 26, 2013 – Civil Contingencies Officer, Council

    Fri, April 26, 2013 – Civil Contingencies Officer, Council The installation was successfully completed today, thanks to all concerned for your help, support, coorporation and coordination with this project.
  • Building Service Manager – M&E Company

    Just so you know there wasn’t any issues with the generator and working with Alex was a pleasure. Found him very patient, understanding and helpful.