24/7 Emergency Call-Out

Dark Overlay

Government &
MOD

Home » Sectors and Case Studies » Government & MOD

Reliable Power Solutions for Government & Ministry of Defence

From local council offices and government agencies to MoD bases, power continuity is critical for security, compliance, and operational stability. Shenton Group has a long and proven history serving government-owned organisations and public sector services, delivering solutions that meet the highest standards of reliability and confidentiality.

Why Power Continuity Matters for Government & MoD

  • Ensure Operational Stability – Avoid downtime that disrupts essential services and critical infrastructure.
  • Meet Compliance and Security Standards – Adhere to stringent government and MoD regulations.
  • Support Sustainability Goals – Reduce carbon emissions and energy costs in line with environmental policies.

What Happens When the Power Stops?

Without reliable power, government and defence organisations face serious consequences:

  • Operational Downtime – Disrupted services, missed deadlines, and compromised security.
  • Equipment Damage – Sudden shutdowns can harm sensitive systems and critical infrastructure.
  • Security Risks – Loss of power can impact surveillance, communications, and emergency response.
  • Loss of Reputation – Failure to maintain continuity can erode public trust.
  • Energy Inefficiency – Rising costs without CHP optimisation.
  • Reduced Resilience – Inability to meet compliance and maintain operational readiness.

Our Expertise in Secure and Challenging Environments

Shenton Group has extensive experience working in high-security and complex locations, always in strict accordance with government and MoD health, safety, and security regulations. Our solutions are designed to deliver resilience and peace of mind for decision-makers responsible for critical operations.

Standby Generators, UPS Systems & Battery Storage

Our solutions include:

  • Standby Generators – Ensure power continuity during outages
  • Generator Hire – Provides temporary power for planned works or emergencies.
  • Uninterruptible Power Supply (UPS) – Ensures that there is no break in power, providing seamless protection for critical systems.
  • Battery Storage Solutions – Store energy for instant backup and support sustainability goals.
  • Power Call Emergency Generator Hire – Rapid response for urgent requirements.

Battery storage adds an extra layer of resilience, enabling facilities to store renewable energy, reduce reliance on the grid, and maintain uptime during transitions or outages.

CHP Maintenance and Efficiency

Combined Heat and Power (CHP) systems generate heat and electricity simultaneously, making them ideal for large government facilities with significant hot water demand. CHP can reduce carbon emissions by up to 30%, cut energy costs, and help meet sustainability targets.

At Shenton Group, we maintain and optimise CHP systems to ensure they deliver maximum efficiency and ROI—helping public sector organisations achieve greener energy and lower bills without compromising reliability.

Our Latest News

  • Tue, November 08, 2011 – Contracts Engineer – Electrical Utilities Company

    Tue, November 08, 2011 – Contracts Engineer – Electrical Utilities Company Over the years we have received excellent service from shentongroup and so I didn’t hesitate to contact them….
  • Tue, October 16, 2012 – Electrical Reseller

    Tue, October 16, 2012 – Electrical Reseller When I have a tricky job that needs doing I call shentongroup.
  • Sat, October 01, 2011 – IT Manager, Lift Manufacturers

    Sat, October 01, 2011 – IT Manager, Lift Manufacturers The installation of the air conditioning was completed on time and to our complete satisfaction.
  • Owner – Radio Station

    I can’t thank you and your team enough for your help with the generator over the weekend. It was the one single thing that I could worry about the least (apart from where to find the fuel gauge!).  It was easy to deal with you, the generator was delivered on time, a lovely piece of … Continued
  • Fri, April 26, 2013 – Facilities Maintenance Contract Manager, County Council

    Fri, April 26, 2013 – Facilities Maintenance Contract Manager, County Council Can you please give my thanks to the shentongroup engineers for successfully completing the generator panel modifications and testing of the system, I would like to thank Paul in particular for coping with the challenging situation under pressure, the shentongroup engineers performed excellently and … Continued
  • Tue, November 08, 2011 – Engineer – Insurance Company

    Tue, November 08, 2011 – Engineer – Insurance Company It is very helpful to have an organisation that can provide us with an integrated service that combines the supply of standby generators with maintenance.  
  • Mon, November 30, 2015 – Project Manager, Building Services Company

    Mon, November 30, 2015 – Project Manager, Building Services Company Can you please thank all you team for delivering this project yesterday to a successful conclusion. Our client and myself really appreciate all the efforts put in to this project.
  • Director of Property, Leading Healthcare Provider

    I am the Director of Property for **********, operating *** residential nursing homes across the UK. For around six years, Power Call has provided outstanding emergency generator support, now covering over 80 of our homes, with 30 more planned next year. Their service is exceptional—reliable, responsive, and consistently exceeding expectations, regularly delivering, installing, and commissioning … Continued
  • Fri, July 25, 2014 – Tyre Specialists

    Fri, July 25, 2014 – Tyre Specialists Very happy with your company, we have a lot of power outages where we are and your generators have never failed to start, been excellent and the service is good. Don’t worry I would never think of going anywhere else when other project arise.
  • Thurs, August 06, 2015 – Electrical Engineer, Consultant Company

    Thurs, August 06, 2015 – Electrical Engineer, Consultant Company Thanks. I cannot speak highly enough of both [CPD] presentations from Richard.
  • Fri, April 26, 2013 – Civil Contingencies Officer, Council

    Fri, April 26, 2013 – Civil Contingencies Officer, Council The installation was successfully completed today, thanks to all concerned for your help, support, coorporation and coordination with this project.
  • Building Service Manager – M&E Company

    Just so you know there wasn’t any issues with the generator and working with Alex was a pleasure. Found him very patient, understanding and helpful.