24/7 Emergency Call-Out

Home » Case Studies

Our Case Studies

Proven Power Solutions Across Every Sector…

At Shenton Group, we don’t just promise reliable power – we deliver it. Our sector-specific case studies showcase how our tailored solutions have helped organisations across the UK overcome complex energy challenges, minimise downtime, and achieve operational resilience. From healthcare and data centres to manufacturing and government infrastructure, each story highlights our commitment to engineering excellence, rapid deployment, and long-term support.

Explore real-world examples of how Shenton Group’s expertise in standby power, CHP, and generator rental solutions has made a measurable impact. Whether you’re seeking energy security, compliance, or cost-efficiency, these case studies provide actionable insights and proven outcomes to guide your decision-making.

Browse our case studies to see The Shenton Group Standard in action.

Filter Options

  • Keeping The Gas Networks Operating

    BACKGROUND Having worked with many gas network providers over the years, Shenton Group was approached once again by a long-standing client to assist with their network role out.  PROJECT OVERVIEW  The requirement for this particular project was to install a natural gas generator at a remote site in Shalford just outside Guildford. These gas network … Continued

  • Virgin Media Turn to Shenton Group to Meet Tier 3 Requirements

    BACKGROUND With an ever-increasing focus on resilience and reliability, Virgin Media embarked on a journey to upgrade their Baguley Data Centre to meet the Tier 3 standard set out by the Uptime Institute. The project plan was to integrate a new generator with the existing two generators on site whilst remaining operational and live. It … Continued

  • Shenton Group Deliver CHP Installation for Luxury London Hotel

    BACKGROUND This Grade II* listed building in London, overlooking the River Thames at Tower Hill was acquired by a global high-end hotel brand to be converted into a development comprising an exclusive hotel, members-only club and serviced apartments. Ardmore was the Developer & Building Contractor enlisted on the job. Having worked with Ardmore on a … Continued

  • Generator and CHP Package for Major Residential Development London

    BACKGROUND The Winstanley & York Road development planned to deliver new housing blocks overlooking the park. High rise residential buildings, a range of commercial, leisure and community spaces, a short distance from Clapham Junction Station.  Fundamental to any new residential development is the need for efficient heating and a reliable power supply. Being the UK’s … Continued

  • Shenton Group Provides Backup Power to Amazon Distribution Centres

    BACKGROUND With same-day delivery now expected as the norm, the UK has seen tremendous investment in distributions centres. Along with many of the largest logistical companies, Amazon has invested heavily in their infrastructure of distribution centres up and down the country. With location being of paramount importance to any Distribution Centre, the Milton Keynes area … Continued

  • Large Pumping Station Puts its Trust in Shenton Group

    BACKGROUND Bentley Ings is a vital flood defence in Doncaster North and helps protect 1,670 properties from flooding by diverting water away from local areas such as Toll Bar, Arksey and Bentley. The defences were undergoing a significant upgrade, spanning over two years and costing £11m. The project was to replace the pumping stations 80-year-old … Continued

  • Leisure Complex Benefits From Four Shenton Group CHPs

    BACKGROUND When one of the nation’s favourite leisure brand was looking to revamp its 20-year-old facility in Bognor, they set out with a goal of producing a state of the art facility with a family-friendly ethos. The upgraded facility would incorporate a series of splash pools, water slides and a wave pool, with the new … Continued

  • Backup Power Solution for Leading Retailers New ‘Green’ Store

    End User: IKEALocation: Greenwich BACKGROUND Having worked on a number of projects previously for this global retail client, Shenton Group was again appointed to design, supply and install the standby power solution. The new store located in Greenwich was designed to be 80% more energy efficient than the current building standard requirements with a BREEAM … Continued