24/7 Emergency Call-Out

Dark Overlay

Biogas &
Waste to Energy

Home » Sectors and Case Studies » Biogas & Waste to Energy

Reliable CHP Maintenance for Biogas & Waste-to-Energy Plants

Maximising uptime and efficiency is critical for biogas and waste-to-energy facilities. Every hour of downtime impacts revenue and sustainability targets. At Shenton Group, we have many years of experience partnering with biogas sites, ensuring they remain operational around the clock.

Why CHP Maintenance Matters for Biogas Plants

  • Maximise Revenue – High availability ensures consistent energy generation and income.
  • Protect Your Investment – Extend the life of your CHP system with expert maintenance.
  • Meet Sustainability Goals – Maintain optimal performance for greener energy production.

Our Expertise in Biogas & Waste-to-Energy

We specialise in maintaining CHP systems for demanding environments, offering:

  • High tolerance to H₂S for biogas applications.
  • Exceptional electrical efficiency for maximum output.
  • Long service life backed by proactive maintenance and optimisation.

Comprehensive Maintenance Packages

Our tailored maintenance programmes include:

  • 24/7 remote monitoring for real-time performance insights.
  • Flexible response levels, including some of the fastest in the industry.
  • Optimisation services to ensure maximum efficiency and ROI.

This combination delivers outstanding performance and very high availability, helping you achieve consistent output and profitability year after year.

Ready to Optimise Your CHP System?
Speak to our experts today to discuss tailored maintenance solutions for your facility.

Explore Our Biogas Case Studies

See how we’ve helped biogas and waste-to-energy plants maintain reliability and maximise revenue:

Our Latest News

  • Tue, November 08, 2011 – Contracts Engineer – Electrical Utilities Company

    Tue, November 08, 2011 – Contracts Engineer – Electrical Utilities Company Over the years we have received excellent service from shentongroup and so I didn’t hesitate to contact them….
  • Tue, October 16, 2012 – Electrical Reseller

    Tue, October 16, 2012 – Electrical Reseller When I have a tricky job that needs doing I call shentongroup.
  • Sat, October 01, 2011 – IT Manager, Lift Manufacturers

    Sat, October 01, 2011 – IT Manager, Lift Manufacturers The installation of the air conditioning was completed on time and to our complete satisfaction.
  • Owner – Radio Station

    I can’t thank you and your team enough for your help with the generator over the weekend. It was the one single thing that I could worry about the least (apart from where to find the fuel gauge!).  It was easy to deal with you, the generator was delivered on time, a lovely piece of … Continued
  • Fri, April 26, 2013 – Facilities Maintenance Contract Manager, County Council

    Fri, April 26, 2013 – Facilities Maintenance Contract Manager, County Council Can you please give my thanks to the shentongroup engineers for successfully completing the generator panel modifications and testing of the system, I would like to thank Paul in particular for coping with the challenging situation under pressure, the shentongroup engineers performed excellently and … Continued
  • Tue, November 08, 2011 – Engineer – Insurance Company

    Tue, November 08, 2011 – Engineer – Insurance Company It is very helpful to have an organisation that can provide us with an integrated service that combines the supply of standby generators with maintenance.  
  • Mon, November 30, 2015 – Project Manager, Building Services Company

    Mon, November 30, 2015 – Project Manager, Building Services Company Can you please thank all you team for delivering this project yesterday to a successful conclusion. Our client and myself really appreciate all the efforts put in to this project.
  • Director of Property, Leading Healthcare Provider

    I am the Director of Property for **********, operating *** residential nursing homes across the UK. For around six years, Power Call has provided outstanding emergency generator support, now covering over 80 of our homes, with 30 more planned next year. Their service is exceptional—reliable, responsive, and consistently exceeding expectations, regularly delivering, installing, and commissioning … Continued
  • Fri, July 25, 2014 – Tyre Specialists

    Fri, July 25, 2014 – Tyre Specialists Very happy with your company, we have a lot of power outages where we are and your generators have never failed to start, been excellent and the service is good. Don’t worry I would never think of going anywhere else when other project arise.
  • Thurs, August 06, 2015 – Electrical Engineer, Consultant Company

    Thurs, August 06, 2015 – Electrical Engineer, Consultant Company Thanks. I cannot speak highly enough of both [CPD] presentations from Richard.
  • Fri, April 26, 2013 – Civil Contingencies Officer, Council

    Fri, April 26, 2013 – Civil Contingencies Officer, Council The installation was successfully completed today, thanks to all concerned for your help, support, coorporation and coordination with this project.
  • Building Service Manager – M&E Company

    Just so you know there wasn’t any issues with the generator and working with Alex was a pleasure. Found him very patient, understanding and helpful.