24/7 Emergency Call-Out

Dark Overlay

Biogas &
Waste to Energy

Home » Sectors and Case Studies » Biogas & Waste to Energy

Reliable CHP Maintenance for Biogas & Waste-to-Energy Plants

Maximising uptime and efficiency is critical for biogas and waste-to-energy facilities. Every hour of downtime impacts revenue and sustainability targets. At Shenton Group, we have many years of experience partnering with biogas sites, ensuring they remain operational around the clock.

Why CHP Maintenance Matters for Biogas Plants

  • Maximise Revenue – High availability ensures consistent energy generation and income.
  • Protect Your Investment – Extend the life of your CHP system with expert maintenance.
  • Meet Sustainability Goals – Maintain optimal performance for greener energy production.

Our Expertise in Biogas & Waste-to-Energy

We specialise in maintaining CHP systems for demanding environments, offering:

  • High tolerance to H₂S for biogas applications.
  • Exceptional electrical efficiency for maximum output.
  • Long service life backed by proactive maintenance and optimisation.

Comprehensive Maintenance Packages

Our tailored maintenance programmes include:

  • 24/7 remote monitoring for real-time performance insights.
  • Flexible response levels, including some of the fastest in the industry.
  • Optimisation services to ensure maximum efficiency and ROI.

This combination delivers outstanding performance and very high availability, helping you achieve consistent output and profitability year after year.

Ready to Optimise Your CHP System?
Speak to our experts today to discuss tailored maintenance solutions for your facility.

Explore Our Biogas Case Studies

See how we’ve helped biogas and waste-to-energy plants maintain reliability and maximise revenue:

Our Latest News

  • Wed, September 18, 2013 – Prepayment Operations & Client Manager for a Global Technology Company

    Wed, September 18, 2013 – Prepayment Operations & Client Manager for a Global Technology Company Just to let you know that all went well and install is completed.  Thanks for a strerling job once again.  Pass my thanks onto Alex and Andrew.
  • District Council

    With Power Call, we are confident that the Council can meet its business continuity and resilience obligations under the Civil Contingencies Act 2004 through an effective and reliable power security plan.
  • Wed, October 12, 2011 – Manager – Health and Fitness Club

    Wed, October 12, 2011 – Manager – Health and Fitness Club When due to our increasing growth we needed to open a second Health and Fitness centre, shentongroup provided us with a clean…
  • Fri, April 26, 2013 – Electrical Contractor

    Fri, April 26, 2013 – Electrical Contractor We are very happy with your service and have no suggestions for improvement everything went as planned with no hiccups. Thank you for your efforts.
  • Mon, December 8, 2014 – Electrical Project Engineer, Leading Engineering Company

    Mon, December 8, 2014 – Electrical Project Engineer, Leading Engineering Company The ***** ***** Test went very well without a hitch. The Client Commissioning Manager & External Consult we’re very impressed with your generator and its integration with the LV Panel. Your engineer Tom and the LV Switch Board engineer worked well together pre-test and gave confidence … Continued
  • Mon, February 25th, 2013 – RAF Lossiemouth

    I would like to formally record my utmost satisfaction regarding the installation of the UPS at Lossiemouth. From the initial planning stages to the meticulous inspection prior to leaving site, the contractor you selected has provided excellent service. The installation meets all of our needs and has been planned, and installed in such a way … Continued
  • Engineering Services Manager – Healthcare Company

    Your Engineer was on time and he called me directly for accurate location details. He was well mannered, informative and didn’t waste any time so he was done collecting data and completed his minor service works quickly so allowing me to undertake the monthly test without too long a delay. All in all this was … Continued
  • Building Service Manager – M&E Company

    Just so you know there wasn’t any issues with the generator and working with Alex was a pleasure. Found him very patient, understanding and helpful.
  • Wed, November 18, 2015 – Mechanical Estimator, Building Services Company

    Wed, November 18, 2015 – Mechanical Estimator, Building Services Company The CPD was very informative and well presented. Richard could answer the vast majority of the questions thrown at him; certainly those within the realm of CHP and was friendly and approachable.
  • Fri, July 29, 2011 – Manager – Theatre

    Fri, July 29, 2011 – Manager – Theatre We didn’t want to have to buy another generator, so contacted shentongroup to see if it was possible to change it from single to three phase power. The company has always looked after us very well so we knew we could rely on them, and, needless to say, … Continued
  • Mon, February 9, 2015 – Engineering Manager, Product Testing Laboratory

    Mon, February 9, 2015 – Engineering Manager, Product Testing Laboratory Thanks. I must say we were very impressed with how your company reacted to our requirement [Rental]. Myself and our client, *******, were particularly impressed with Tom. He was very polite, positive with good technical knowledge about the equipment and very helpful. A credit to … Continued
  • Wed, August 31, 2016 – Project Manager, M&E Company

    Wed, August 31, 2016 – Project Manager, M&E Company I understand everything was up and running by 8:15pm, which was absolutely brilliant and the ***** Director was very pleased.  Thanks for all your help last night; I know it was very last minute. We will be forwarding the official order this morning.  I believe its things … Continued