Reliable CHP Maintenance for Biogas & Waste-to-Energy Plants

Maximising uptime and efficiency is critical for biogas and waste-to-energy facilities — every hour of downtime impacts revenue and sustainability targets. At Shenton Group, we have many years of experience partnering with biogas sites, ensuring they remain operational around the clock through specialist CHP maintenance built for the specific demands of anaerobic digestion and waste-to-energy environments. 

Why CHP Maintenance Matters for Biogas Plants

  • Maximise Revenue – High availability ensures consistent energy generation and income.
  • Protect Your Investment – Extend the life of your CHP system with expert maintenance.
  • Meet Sustainability Goals – Maintain optimal performance for greener energy production.

Our Expertise in Biogas & Waste-to-Energy

We specialise in maintaining CHP systems for demanding environments, offering:

  • High tolerance to H₂S for biogas applications.
  • Exceptional electrical efficiency for maximum output.
  • Long service life backed by proactive maintenance and optimisation.

Comprehensive Maintenance Packages

Our tailored maintenance programmes include:

  • 24/7 remote monitoring for real-time performance insights.
  • Flexible response levels, including some of the fastest in the industry.
  • Optimisation services to ensure maximum efficiency and ROI.

This combination delivers outstanding performance and very high availability, helping you achieve consistent output and profitability year after year.

What Makes Biogas CHP Maintenance Different

Standard CHP maintenance schedules aren’t built for the operating conditions inside a biogas or waste-to-energy plant. Anaerobic digestion produces biogas rich in hydrogen sulphide (H₂S), a corrosive gas that accelerates wear on engine components not specified for it. A maintenance program built for biogas needs to account for: 

  • Fuel composition monitoring — biogas quality varies by feedstock, and engine settings need adjusting accordingly to protect efficiency and service life. 
  • Corrosion-aware component scheduling — parts exposed to H₂S-rich gas typically need more frequent inspection than in a natural gas CHP application. 
  • Availability-first response — because CHP downtime at a biogas site stops generation (and therefore income) immediately, response speed matters more here than in many other CHP applications. 

F&Qs

Ready to Optimise Your CHP System?
Speak to our experts today to discuss tailored maintenance solutions for your facility.

Explore Our Biogas Case Studies

See how we’ve helped biogas and waste-to-energy plants maintain reliability and maximise revenue:

Our Latest News

  • Wed, August 31, 2016 – Project Manager, M&E Company

    Wed, August 31, 2016 – Project Manager, M&E Company I understand everything was up and running by 8:15pm, which was absolutely brilliant and the ***** Director was very pleased.  Thanks for all your help last night; I know it was very last minute. We will be forwarding the official order this morning.  I believe its things … Continued
  • Fri, April 26, 2013 – Electrical Contractor

    Fri, April 26, 2013 – Electrical Contractor We are very happy with your service and have no suggestions for improvement everything went as planned with no hiccups. Thank you for your efforts.
  • David Harbour – Andover Radio

    Sorry – but I can’t give Shenton a higher rating! They are simply superb. Nothing too much trouble.
  • Wed, January 14, 2015 – Owner, Large Farm

    Wed, January 14, 2015 – Owner, Large Farm All I want to add is that we were highly impressed with the professionalism of your team in dealing with the installation. It really is a magnificent piece of kit! (And it’s got a Perkins Diesel engine – the sound of which I’m very familiar with!) Many thanks … Continued
  • IT Manager – Solicitors

    As an IT Manager within a busy solicitors’ practice, uninterrupted power is critical to our systems, data access, and client service. Although power outages are infrequent, Power Call provides a cost-effective and reassuring solution that ensures full business continuity if the worst should happen. Their service gives us confidence that, in the event of an … Continued
  • Mon, March 27, 2017 – Manager, Data Management company

    Good afternoon Terry, I just wanted to pay you an email to give out thanks for the work yourself and Shenton have done with regards to Saturday’s UPS install here at ***********. The Saturday works went ahead as planned and on schedule at 7am our side and by 8am Dan, Callum & Vic had the … Continued
  • Mon, December 8, 2014 – Electrical Project Engineer, Leading Engineering Company

    Mon, December 8, 2014 – Electrical Project Engineer, Leading Engineering Company The ***** ***** Test went very well without a hitch. The Client Commissioning Manager & External Consult we’re very impressed with your generator and its integration with the LV Panel. Your engineer Tom and the LV Switch Board engineer worked well together pre-test and gave confidence … Continued
  • Tue, July 30, 2013 – Service Sales Engineer, Contract Reseller Company

    Tue, July 30, 2013 – Service Sales Engineer, Contract Reseller Company Our Client has emailed – he wants me to pass on a big thank you to James and everyone else involved in the Gene hire over the last week.
  • Mon, February 25th, 2013 – RAF Lossiemouth

    I would like to formally record my utmost satisfaction regarding the installation of the UPS at Lossiemouth. From the initial planning stages to the meticulous inspection prior to leaving site, the contractor you selected has provided excellent service. The installation meets all of our needs and has been planned, and installed in such a way … Continued
  • Fri, November 7, 2014 – Electrical Site Foreman, Building Services Company

    Fri, November 7, 2014 – Electrical Site Foreman, Building Services Company I would like to take this opportunity to thank you and your site team for the excellent service you provided for the recent generator hire at the hospital. Special thanks goes to Tom and Doug for their professional manner in conducting the initial site … Continued
  • Service Manager – Real Estate

    I would just like to pass on from both Mike, and myself our appreciation, and sincere thanks to you and the rest of Shenton Team. During the evening, and our day spent factory testing the whole ethos of the group shone through, and for QVC it is a real pleasure to be working in conjunction … Continued
  • Paul Hamblyn – Managing Director and Chief Operating Officer of EuroSite Power.

    Shenton Group have been a trusted partner since 2012. Their knowledge of the TEDOM CHP product proved invaluable when commissioning this complex project for CEFAS (Centre for Environment, Fisheries and Aquaculture Science), helping us to achieve the objectives set by our client.”