24/7 Emergency Call-Out

Home » Products & Services » Fuel Systems & Transfer Solutions

Fuel Systems & Transfer Solutions

At Shenton Group, we don’t just install fuel systems, we engineer peace of mind. Whether you’re powering a critical facility or a bespoke commercial site, our fuel infrastructure is designed to deliver uninterrupted performance, total compliance, and long-term reliability.

Fuel Storage Solutions

Every site is different. That’s why our tanks are tailored to your exact requirements.

Tank Options

  • Base Tanks – Integrated beneath the generator for compact, direct feed.
  • Day Tanks – Ideal for extended autonomy or space-restricted installs.
  • Bulk Tanks – High-capacity external tanks for long-duration resilience.
  • Extended Base Tanks – Customised for runtime without increasing footprint.

Tank Locations

  • External, rooftop, basement, or underground
  • Fully compliant with PPG2, PPG27, DEFRA, HSE, and Building Regulations

We assess environmental risks and engineer containment solutions that protect your site and reputation.

Fuel Transfer Systems

Precision-engineered for safe, efficient delivery.

Pipework Options

  • Powerpipe – Our proprietary compression system
  • Welded Steel Pipe-in-Pipe – Durable and robust
  • Flexible Twin-Wall Stainless Steel – Ideal for complex routing
  • Underground Plastic Pipe-in-Pipe – Discreet and compliant

Pump Systems

  • Duty/standby configurations
  • Sized for flow rate and head pressure
  • Integrated control panels for safe, intelligent operation

Fuel Polishing & Conditioning

Protect your investment. Maintain fuel integrity.

  • Removes particulates and water
  • Internal or external enclosures
  • Programmable cycles with BMS integration
  • Essential for long-term storage and HVO compatibility

Fill Points & Delivery Options

Designed for ease, safety, and flexibility.

  • Manual/Electric Fill Pumps – Flexible refuelling options
  • Tank-Mounted Fill Points – Direct access within bunded areas
  • Remote Fill Cabinets – For hard-to-reach installations
  • Barrel/Bowser Fill – Ground-level access

Leak Detection & Monitoring

Compliance isn’t optional. We make it effortless.

  • Zonal cable systems to differentiate diesel vs water
  • Bund probes and level gauges with alarms
  • Vacuum-based outer skin monitoring

Fuel Types Supported

  • Natural Gas – For CHP and low-emission applications
  • DERV (White Diesel) – Ultra-low sulphur
  • RED Diesel (Gas Oil) – Restricted use post-April 2022
  • HVO (Hydrotreated Vegetable Oil) – Renewable and cleaner

Need a compliant, high-performance fuel system?

Speak to a power expert today – book your free consultation.

Contact Us

Our FAQ’s

Speak to a Power Expert Today

Get in touch today and book your free site assessment.

Contact Us
  • D

    Derek Sidaway – Sedgwick International UK

    Professional, efficient, courteous, I cannot praise the company and the staff enough. Our project was to remove a generator and associated control equipment from site, couldn’t have gone any smoother!
  • A

    Andy Hughes, Chief Technology Officer – Intelligence Hosting Services Limited

    After having major issues with a so called “Generator Specialist” we needed to find a company that was competent in ensuring our backup power facilities were installed correctly as well as safe. After speaking with Shenton Group over the phone, an initial site survey was carried out along with the works that were needed to … Continued
  • P

    Paul Hamblyn – Managing Director and Chief Operating Officer of EuroSite Power.

    Shenton Group have been a trusted partner since 2012. Their knowledge of the TEDOM CHP product proved invaluable when commissioning this complex project for CEFAS (Centre for Environment, Fisheries and Aquaculture Science), helping us to achieve the objectives set by our client.”

Our Latest News

  • Case Study: Powering 150 Fibre Network Sites with Uninterrupted Power Solutions

    Location: NationwideClient: Leading National Fibre Network ProviderEnd User: Businesses and Consumers NationwideSector: Fibre Network Infrastructure Products/Services Used: Client Overview Our client is a leading national fibre network provider operating across 190+ sites. They deliver high-speed connectivity to businesses and consumers, relying on resilient power infrastructure to maintain continuous service availability. Their operations are critical to … Continued

  • Case Study: Shenton Group Provides Reliable Power to Global Biopharmaceutical Distribution Centres

    Sector: PharmaceuticalsLocation: Liverpool Products/ Services Background A global biopharmaceutical company, based in the north west of the UK, was expanding due to the increase in demand for pharmaceutical supplies during the COVID-19 pandemic. Further manufacturing and cold storage were required on-site, and temporary power was needed for this expansion. Project Overview Shenton Group was tasked … Continued

  • Case Study – Porton Science Park

    Client: Wiltshire CouncilSector: Local AuthorityLocation: Porton Down Products/Services Background Porton Science Park provides a platform for Science and Technology to innovate in an environment that welcomes and supports new business start ups. Working in partnership with Wiltshire council and DSTL (the Ministry of Defence’s Defence and Science Technology Laboratory), who are an existing customer, Shenton … Continued

  • Case Study: Amazon Distribution Centres

    Client: Amazon Direct Sector: Distribution Location: Tilbury Products/ Services Background Amazon Direct is one of the largest distributors in the UK with over 30 warehouses operating currently. In 2021 an unplanned service requirement arose in one of Amazon’s distribution centres, which resulted in the requirement for a rental generator. Shenton Group were asked to provide … Continued

  • Backup Generator Solution for Ilona Rose House

    Client: Gratte BrothersSector: Mixed-Use Development Location: Soho, London Products/Services Background Ilona Rose House, set in the heart of Soho, London, is a 31,0,00sqm new-build project spread over 13 floors, including four below ground. With a build cost of £100m, the development will contain shops, restaurants, bars, offices, residential apartments, a gallery and a nightclub. Shenton Group … Continued

  • Providing Power Continuity to Virgin Media

    The Virgin Media Technology Service Centre, a campus facility in Knowsley, UK, was subject to technical upgrading of its supportive infrastructure to better enhance the power resilience to the site.

    The existing Diesel Rotary Uninterruptible Power Supplies (DRUPS) technology became extremely expensive to maintain, leading to the decision to upgrade the equipment. Shenton Group was once again entrusted with this project due to an ongoing relationship with previous power installations for Virgin Media.