Case Study: Delivering Rapid-Response Temporary Power for Critical Weekend Testing at a Leading Aerospace Manufacturer
Home » Case Study: Delivering Rapid-Response Temporary Power Solution
Client Overview
Sector: Manufacturing / Aerospace Location: Southwest England, UK
Project Overview
A leading facilities services provider recently approached Shenton Group for a rapid response temporary power solution to support essential weekend testing at a major aerospace manufacturing site. The site required reliable temporary power to maintain operational continuity and protect sensitive materials throughout the planned works.
With only a week’s notice, Shenton Group delivered a resilient, fully managed system that ensured seamless power throughout the testing period, enabling the manufacturer to proceed without disruption or delay.
The Challenge
The aerospace manufacturer had scheduled critical testing across a weekend. These activities required a stable and uninterrupted power supply to prevent:
Interruption to vital operational processes
Risk of sensitive or high-value materials becoming spoiled
Delays to essential testing programmes
Potential cost implications associated with downtime
A week before the work was due to begin, it became clear that no temporary power arrangements had been made. The facilities services provider required a dependable partner who could:
Respond immediately
Provide a reliable and resilient backup power setup
Deliver, install, and commission all equipment within a tight timeframe
Achieve this with zero impact on ongoing site operations
Our Temporary Power Solution and Rapid Deployment
Shenton Group quickly mobilised and deployed a robust power package designed to meet the site’s load demands and resilience requirements:
2 × 800 kVA generators (N+1 resilience scenario)
1 × 200 kVA generator
Full delivery, setup, and commissioning within the one-week window
This configuration ensured:
Full redundancy via N+1 protection
Continuous power availability
A stable and dependable supply throughout the testing period
Our engineering team attended the site immediately, conducted a detailed assessment, and coordinated all logistics to ensure the system was in place ahead of the scheduled works.
Results of the Rapid Power Deployment
The temporary power solution operated flawlessly for the duration of the testing programme, enabling the manufacturer to:
Complete all scheduled testing on time
Maintain full operational continuity
Prevent material spoilage or delays
Carry out business-critical activities without interruption
Despite the extremely short notice period, Shenton Group ensured a smooth, reliable, and efficient delivery from planning through to completion.
Project Summary
This project demonstrates Shenton Group’s expertise in providing dependable, rapid-response temporary power solutions for high-demand industrial environments. Even with limited notice, our team delivered a resilient power package that enabled essential operations to continue safely and efficiently.
If your organisation requires emergency, temporary, or short-term power, Shenton Group offers complete turnkey support — from system design and logistics to installation and commissioning.
To find out how we can help power your project, click the button below or contact our team today.
A leading aerospace manufacturer required urgent temporary power to support essential weekend testing. Shenton Group stepped in with a rapid‑response solution, delivering and commissioning a fully resilient system within one week.
Read more about the project…
Discover how Shenton Group delivered rapid-response, centralised power solutions to over 100 critical healthcare sites – meeting every emergency SLA and transforming risk into reliability.
Read the full story to learn more.
A major gas network provider was facing critical disruptions due to unreliable generator maintenance. We stepped in with a tailored solution to keep their operations running smoothly – 24/7.
Location: NationwideClient: Leading National Fibre Network ProviderEnd User: Businesses and Consumers NationwideSector: Fibre Network Infrastructure Products/Services Used: Client Overview Our client is a leading national fibre network provider operating across 190+ sites. They deliver high-speed connectivity to businesses and consumers, relying on resilient power infrastructure to maintain continuous service availability. Their operations are critical to … Continued
Explore how Shenton Group powered one of the UK’s leading water utility companies with turnkey generator solutions – including generator for hire UK, standby generator supply, and nationwide generator servicing for utilities.
Sector: Manufacturing Products/ Services The project included six rental generators of varying sizes: one 800 kVA, three 500 kVA, one 300 kVA, and one 200 kVA, supported by six bulk fuel tanks. Additional equipment included cables, delivery, installation, fuel management, cable ramps, and a load bank. Background This case study showcases Shenton Group’s expertise in … Continued
Sector: PharmaceuticalsLocation: Liverpool Products/ Services Background A global biopharmaceutical company, based in the north west of the UK, was expanding due to the increase in demand for pharmaceutical supplies during the COVID-19 pandemic. Further manufacturing and cold storage were required on-site, and temporary power was needed for this expansion. Project Overview Shenton Group was tasked … Continued
Client: Wiltshire CouncilSector: Local AuthorityLocation: Porton Down Products/Services Background Porton Science Park provides a platform for Science and Technology to innovate in an environment that welcomes and supports new business start ups. Working in partnership with Wiltshire council and DSTL (the Ministry of Defence’s Defence and Science Technology Laboratory), who are an existing customer, Shenton … Continued
Client: Amazon Direct Sector: Distribution Location: Tilbury Products/ Services Background Amazon Direct is one of the largest distributors in the UK with over 30 warehouses operating currently. In 2021 an unplanned service requirement arose in one of Amazon’s distribution centres, which resulted in the requirement for a rental generator. Shenton Group were asked to provide … Continued
Shenton Group’s solution provides the Bristol City Council network with huge electrical and heat savings and provides reductions in the city’s environmental impact.
Marble Arch Place, located on Bayswater Road, Marylebone, London, is a new mixed-use development. Shenton Group designed, supplied and installed the life safety and backup power solution for the site.
Client: Gratte BrothersSector: Mixed-Use Development Location: Soho, London Products/Services Background Ilona Rose House, set in the heart of Soho, London, is a 31,0,00sqm new-build project spread over 13 floors, including four below ground. With a build cost of £100m, the development will contain shops, restaurants, bars, offices, residential apartments, a gallery and a nightclub. Shenton Group … Continued