24/7 Emergency Call-Out

Dark Overlay

Healthcare

Power Solutions That Keep Healthcare Running

Healthcare facilities cannot afford downtime. From hospitals to care homes, uninterrupted power is critical for patient safety and compliance. At Shenton Group, we deliver tailored solutions that guarantee reliability, meet strict regulations, and provide peace of mind. Discover how we’ve helped healthcare providers across the UK maintain power continuity when it matters most.

NHS Hospitals

Critical Care Power Assurance

Discover how we delivered a robust backup power solution to safeguard life-saving equipment and ensure compliance for NHS facilities.

Private Clinics

Seamless Generator Integration and maintenance

Learn how we integrated a generator system without disruption, guaranteeing uninterrupted patient care and meeting strict healthcare standards.

Care Home Groups

Complete Power Redundancy Plans

See how our power solutions provide a reliable plan B when the power goes out, supporting vulnerable residents, reducing risk and ensuring peace of mind for care providers.

Why Choose Shenton Group for Healthcare?

  • Uninterrupted Power – Protect patients and staff with guaranteed backup systems.
  • Compliance Assured – Fully aligned with healthcare regulations and standards.
  • Proven Expertise – Trusted by NHS and private healthcare providers nationwide.


Trusted by Leading Healthcare Providers

  • ISO-certified solutions
  • NHS partnerships
  • 40+ years of power expertise

Our Latest News

  • Case Study: Powering 150 Fibre Network Sites with Uninterrupted Power Solutions

    Location: NationwideClient: Leading National Fibre Network ProviderEnd User: Businesses and Consumers NationwideSector: Fibre Network Infrastructure Products/Services Used: Client Overview Our client is a leading national fibre network provider operating across 190+ sites. They deliver high-speed connectivity to businesses and consumers, relying on resilient power infrastructure to maintain continuous service availability. Their operations are critical to … Continued

  • Case Study: Shenton Group Provides Reliable Power to Global Biopharmaceutical Distribution Centres

    Sector: PharmaceuticalsLocation: Liverpool Products/ Services Background A global biopharmaceutical company, based in the north west of the UK, was expanding due to the increase in demand for pharmaceutical supplies during the COVID-19 pandemic. Further manufacturing and cold storage were required on-site, and temporary power was needed for this expansion. Project Overview Shenton Group was tasked … Continued

  • Case Study – Porton Science Park

    Client: Wiltshire CouncilSector: Local AuthorityLocation: Porton Down Products/Services Background Porton Science Park provides a platform for Science and Technology to innovate in an environment that welcomes and supports new business start ups. Working in partnership with Wiltshire council and DSTL (the Ministry of Defence’s Defence and Science Technology Laboratory), who are an existing customer, Shenton … Continued

  • Case Study: Amazon Distribution Centres

    Client: Amazon Direct Sector: Distribution Location: Tilbury Products/ Services Background Amazon Direct is one of the largest distributors in the UK with over 30 warehouses operating currently. In 2021 an unplanned service requirement arose in one of Amazon’s distribution centres, which resulted in the requirement for a rental generator. Shenton Group were asked to provide … Continued

  • Backup Generator Solution for Ilona Rose House

    Client: Gratte BrothersSector: Mixed-Use Development Location: Soho, London Products/Services Background Ilona Rose House, set in the heart of Soho, London, is a 31,0,00sqm new-build project spread over 13 floors, including four below ground. With a build cost of £100m, the development will contain shops, restaurants, bars, offices, residential apartments, a gallery and a nightclub. Shenton Group … Continued

  • Providing Power Continuity to Virgin Media

    The Virgin Media Technology Service Centre, a campus facility in Knowsley, UK, was subject to technical upgrading of its supportive infrastructure to better enhance the power resilience to the site.

    The existing Diesel Rotary Uninterruptible Power Supplies (DRUPS) technology became extremely expensive to maintain, leading to the decision to upgrade the equipment. Shenton Group was once again entrusted with this project due to an ongoing relationship with previous power installations for Virgin Media.

Need expert advice for ensuring power continuity for your healthcare facility? Speak to our experts today.

Contact Us
  • T

    Thu, November 01, 2012 – Technical Sales Engineer, Reseller

    Thu, November 01, 2012 – Technical Sales Engineer, Reseller Thank you for the professional quote sent in the post and the mints to go with. I’ve never seen anyone in the years I’ve been in this industry, send a quote quite like this. If the quotes are this good, service must be outstanding.
  • T

    Thurs, March 30, 2017 – PA & Team Secretary, M&E Company

    I just wanted to send an email with the feedback from attendees for the Combined Heat & Power CPD yesterday. Staff have said it was an excellent example of what a CPD session should be (by all accounts they have had some rather poor one’s in the past) and they asked me to feed this … Continued
  • P

    Private Owner – End User

    …I will use your firm again and will recommend you to anybody for honest and reliable service…
  • T

    Tue, November 08, 2011 – Principle Oil & Development Engineer

    Tue, November 08, 2011 – Principle Oil & Development Engineer shentongroup’s generators are robust for longevity, large enough to run the degasification and ancillary equipment but still maintain low noise levels. They have an excellent reputation and ability to think outside the box.
  • D

    Director of Property, Leading Healthcare Provider

    I am the Director of Property for **********, operating *** residential nursing homes across the UK. For around six years, Power Call has provided outstanding emergency generator support, now covering over 80 of our homes, with 30 more planned next year. Their service is exceptional—reliable, responsive, and consistently exceeding expectations, regularly delivering, installing, and commissioning … Continued
  • T

    Tues, May 03, 2016 – Strategic Sales Manager, Client

    Tues, May 03, 2016 – Strategic Sales Manager, Client Thank you very much for this completion certificate and thanks to all the team, another quality installation from start to finish. I saw the installation on Friday and all seems to be ship ‘shaped!
  • S

    Service Engineer – Healthcare Sector

    I can’t emphasis how happy we are with the professional and extremely quick manor everything has been dealt with.
  • B

    Building Service Manager – Large M&E Company

    James, today’s training went well. Please let your mangers know Alex continued to be very thorough and professional when carrying out his work.
  • M

    Mon, December 8, 2014 – Electrical Project Engineer, Leading Engineering Company

    Mon, December 8, 2014 – Electrical Project Engineer, Leading Engineering Company The ***** ***** Test went very well without a hitch. The Client Commissioning Manager & External Consult we’re very impressed with your generator and its integration with the LV Panel. Your engineer Tom and the LV Switch Board engineer worked well together pre-test and gave confidence … Continued
  • T

    Thu, September 29, 2011 – Projects Manager MOD Site

    Thu, September 29, 2011 – Projects Manager MOD Site shentongroup site operatives were clean and tidy, courteous and professional in their conduct.
  • M

    Martina – Healthcare

    Shenton Group supplied and installed a standby generator at my Company HQ and have been responsible for maintenance and refuelling. The service received has been excellent since the outset, both in terms of planned works and emergency repairs, the engineers have been reliable and effective, and all of the Shenton Group team have worked well … Continued
  • S

    Sun, September 11, 2011 – Facilities Manager Software Company – Reading

    Sun, September 11, 2011 – Facilities Manager Software Company – Reading shentongroup engineers were exceptionally clean and tidy and carried out a quality installation. The project was completed on time and was good value for money.