24/7 Emergency Call-Out

Dark Overlay

Healthcare

Power Solutions That Keep Healthcare Running

Healthcare facilities cannot afford downtime. From hospitals to care homes, uninterrupted power is critical for patient safety and compliance. At Shenton Group, we deliver tailored solutions that guarantee reliability, meet strict regulations, and provide peace of mind. Discover how we’ve helped healthcare providers across the UK maintain power continuity when it matters most.

NHS Hospitals

Critical Care Power Assurance

Discover how we delivered a robust backup power solution to safeguard life-saving equipment and ensure compliance for NHS facilities.

Private Clinics

Seamless Generator Integration and maintenance

Learn how we integrated a generator system without disruption, guaranteeing uninterrupted patient care and meeting strict healthcare standards.

Care Home Groups

Complete Power Redundancy Plans

See how our power solutions provide a reliable plan B when the power goes out, supporting vulnerable residents, reducing risk and ensuring peace of mind for care providers.

Why Choose Shenton Group for Healthcare?

  • Uninterrupted Power – Protect patients and staff with guaranteed backup systems.
  • Compliance Assured – Fully aligned with healthcare regulations and standards.
  • Proven Expertise – Trusted by NHS and private healthcare providers nationwide.


Trusted by Leading Healthcare Providers

  • ISO-certified solutions
  • NHS partnerships
  • 40+ years of power expertise

Our Latest News

Need expert advice for ensuring power continuity for your healthcare facility? Speak to our experts today.

Contact Us
  • M

    Martina – Healthcare

    Shenton Group supplied and installed a standby generator at my Company HQ and have been responsible for maintenance and refuelling. The service received has been excellent since the outset, both in terms of planned works and emergency repairs, the engineers have been reliable and effective, and all of the Shenton Group team have worked well … Continued
  • T

    Tue, September 27, 2016 – Director, Electrical Services Company

    Thank you, the client and ourselves are pleased with your installation
  • T

    Tue, November 08, 2011 – Electrical Design Engineer – University

    Tue, November 08, 2011 – Electrical Design Engineer – University We have received excellent service from shentongroup, which was able to advise us on the best possible way of ensuring that all our essential equipment could continue functioning during powercuts
  • S

    Senior Project Manager, Major Technology Company

    Hi Julie, I’ve now completed the project to upgrade the datacentre UPS/generator and handed over… …I should like to thank you and all of your colleagues for your hard work in helping us achieve a great result.
  • A

    Alex Robinson – AD Plant Manager

    I have found Shenton Group to be a thoroughly professional organisation. Running an AD plant is a 24/7 operation, with constant oversight required. However, even though the CHPs are one of the most critical parts of the AD plant, I have no concerns about their operation, due to the efficiency of the support service provided.
  • W

    Wed, September 18, 2013 – Prepayment Operations & Client Manager for a Global Technology Company

    Wed, September 18, 2013 – Prepayment Operations & Client Manager for a Global Technology Company Just to let you know that all went well and install is completed.  Thanks for a strerling job once again.  Pass my thanks onto Alex and Andrew.
  • T

    Thurs, August 06, 2015 – Electrical Engineer, Consultant Company

    Thurs, August 06, 2015 – Electrical Engineer, Consultant Company Thanks. I cannot speak highly enough of both [CPD] presentations from Richard.
  • M

    Mon, February 25th, 2013 – RAF Lossiemouth

    I would like to formally record my utmost satisfaction regarding the installation of the UPS at Lossiemouth. From the initial planning stages to the meticulous inspection prior to leaving site, the contractor you selected has provided excellent service. The installation meets all of our needs and has been planned, and installed in such a way … Continued
  • T

    Thurs, June 5, 2014 – Medical Research Company

    Thurs, June 5, 2014 – Medical Research Company Again, please pass along my thanks to Alex for staying on site to rectify the wiring issue for us & avoiding having to re-schedule a visit – very much appreciated. He was a pleasure to deal with, very professional and personable  
  • T

    Tue, November 08, 2011 – Principle Oil & Development Engineer

    Tue, November 08, 2011 – Principle Oil & Development Engineer shentongroup’s generators are robust for longevity, large enough to run the degasification and ancillary equipment but still maintain low noise levels. They have an excellent reputation and ability to think outside the box.
  • T

    Tue, December 04, 2012 – Senior Service Manager, Manufacturing Company

    Tue, December 04, 2012 – Senior Service Manager, Manufacturing Company Thank you very much for your help and organization last week.
  • M

    Mon, June 13, 2016 – Project Manager, Major Engineering Company

    Mon, June 13, 2016 – Project Manager, Major Engineering Company When I checked with my colleagues who’d worked with you before on the Newcastle jobs, they said ‘shentongroup are great to deal with. No concerns at all, and if there are ever any problems on a project they always get them sorted’.