Shenton Group News

Turnkey Generator Solution For Welsh Water

Along with offering a turnkey project where we would also remove the old equipment, the design we put forward negated the need for rental generators and reduced the amount of cable, which would save the client a quarter of a million pounds. This ultimately leads us to win the project. 

Read More

Royal Mail Gets a Royal Backup Power Solution From Shenton Group

BACKGROUND As the Royal Mail continue to invest in their infrastructure, Shenton Group were once again called upon to offer a resilient standby power solution to support one of their distribution centres. The project was progressing under tight deadlines, and a well-respected M&E contractor contracted Shenton Group to design, supply…

Read More

Keeping The Gas Networks Operating

BACKGROUND Having worked with many gas network providers over the years, Shenton Group was approached once again by a long-standing client to assist with their network role out.  PROJECT OVERVIEW  The requirement for this particular project was to install a natural gas generator at a remote site in Shalford just…

Read More

Large Pumping Station Puts its Trust in Shenton Group

BACKGROUND Bentley Ings is a vital flood defence in Doncaster North and helps protect 1,670 properties from flooding by diverting water away from local areas such as Toll Bar, Arksey and Bentley. The defences were undergoing a significant upgrade, spanning over two years and costing £11m. The project was to…

Read More

Birmingham Airport Power Solution – Shenton Wins 20+ Maintenance Contracts

Client: Birmingham AirportLocation: Birmingham Products/ Services 2 x 1100kVA standby rated diesel generators in an N+1 configuration Design and build Delivery, off-loading and positioning Bespoke 100 metre fuel transfer line System commissioning  22 maintenance contracts BACKGROUND A new baggage substation was being developed and required a generator solution with…

Read More

Major IT Company Moves Headquarters with Help from Shenton Group

OVERVIEW The ever-expanding world of IT depends one hundred percent on the availability of reliable continuous power supplies. When a major IT infrastructure company decided to relocate its headquarters, it entrusted its continuous power supplies to Shenton Group, which firstly provided a standby generator whilst managing the modification of an…

Read More

Unique CHP and Generator Solution for Gas to Grid Site

 Client: Murrow AD Ltd, Somerset Farm  Location: Murrow, Wisbech, Cambridgeshire   Products/ Services  2 No. 500kWe dual fuel CHP units in acoustic containers  330kVA diesel generator  Gas treatment skid & desulphurisation unit  Bespoke control system and software programming  Commissioning services  G99 witness testing  Maintenance contract  BACKGROUND The Murrow AD team approached…

Read More