Reliable Power Solutions for Government & Ministry of Defence

From local council offices and government agencies to MoD bases, power continuity is critical for security, compliance, and operational stability. Shenton Group has a long and proven history serving government-owned organisations and public sector services, including a delivered partnership with Wiltshire Council and DSTL (the Ministry of Defence’s Defence Science and Technology Laboratory) at Porton Science Park, and district heating infrastructure for Bristol City Council. 

Why Power Continuity Matters for Government & MoD

  • Ensure Operational Stability – Avoid downtime that disrupts essential services and critical infrastructure.
  • Meet Compliance and Security Standards – Adhere to stringent government and MoD regulations.
  • Support Sustainability Goals – Reduce carbon emissions and energy costs in line with environmental policies.

What Happens When the Power Stops?

Without reliable power, government and defence organisations face serious consequences:

  • Operational Downtime – Disrupted services, missed deadlines, and compromised security.
  • Equipment Damage – Sudden shutdowns can harm sensitive systems and critical infrastructure.
  • Security Risks – Loss of power can impact surveillance, communications, and emergency response.
  • Loss of Reputation – Failure to maintain continuity can erode public trust.
  • Energy Inefficiency – Rising costs without CHP optimisation.
  • Reduced Resilience – Inability to meet compliance and maintain operational readiness.

Our Expertise in Secure and Challenging Environments

Shenton Group has extensive experience working in high-security and complex locations, always in strict accordance with government and MoD health, safety, and security regulations. Our solutions are designed to deliver resilience and peace of mind for decision-makers responsible for critical operations.

Standby Generators, UPS Systems & Battery Storage

Our solutions include:

  • Standby Generators – Ensure power continuity during outages
  • Generator Hire – Provides temporary power for planned works or emergencies.
  • Uninterruptible Power Supply (UPS) – Ensures that there is no break in power, providing seamless protection for critical systems.
  • Battery Storage Solutions – Store energy for instant backup and support sustainability goals.
  • Power Call Emergency Generator Hire – Rapid response for urgent requirements.

Battery storage adds an extra layer of resilience, enabling facilities to store renewable energy, reduce reliance on the grid, and maintain uptime during transitions or outages.

Power for Councils, Government Agencies & Defence Sites

  • Local authorities & science parks — At Porton Science Park, we worked in partnership with Wiltshire Council and DSTL to support a site providing a platform for science and technology start-ups, requiring power infrastructure that could scale as the site grew and meet the security expectations of an existing MoD-linked customer. 
  • District heating & council infrastructure — For Bristol City Council, our bespoke CHP solution delivers substantial electrical and heat savings across the council’s network, while reducing the city’s environmental impact. 
  • High-security and defence sites — Beyond named case studies, we work routinely in high-security and complex MoD locations, always in strict accordance with the relevant government and defence health, safety and security regulations. 

F&Qs

CHP Maintenance and Efficiency

Combined Heat and Power (CHP) systems generate heat and electricity simultaneously, making them ideal for large government facilities with significant hot water demand. CHP can reduce carbon emissions by up to 30%, cut energy costs, and help meet sustainability targets.

At Shenton Group, we maintain and optimise CHP systems to ensure they deliver maximum efficiency and ROI—helping public sector organisations achieve greener energy and lower bills without compromising reliability.

Our Latest News

  • Thurs, March 30, 2017 – PA & Team Secretary, M&E Company

    I just wanted to send an email with the feedback from attendees for the Combined Heat & Power CPD yesterday. Staff have said it was an excellent example of what a CPD session should be (by all accounts they have had some rather poor one’s in the past) and they asked me to feed this … Continued
  • Sat, June 11, 2011 – Senior Building Services Engineer – Construction Comapany

    Sat, June 11, 2011 – Senior Building Services Engineer – Construction Comapany When the power outaged occurred the generator coped very well. shentongroup did an excellent job and I have no hesitation in recommending the company to others and using it again as the need arises.
  • Wed, January 14, 2015 – Owner, Large Farm

    Wed, January 14, 2015 – Owner, Large Farm All I want to add is that we were highly impressed with the professionalism of your team in dealing with the installation. It really is a magnificent piece of kit! (And it’s got a Perkins Diesel engine – the sound of which I’m very familiar with!) Many thanks … Continued
  • Wed, October 19, 2011 – Property Manager – Pharmaceutical Consultants

    Wed, October 19, 2011 – Property Manager – Pharmaceutical Consultants With an overheating Comms room becoming more and more common shentongroup provided us with a quick and efficient solution.
  • Tue, July 02, 2013 – Manager, Hire Company

    Tue, July 02, 2013 – Manager, Hire Company Chloe couldn’t do enough to help with the whole hire, she was great and makes you want to hire again and again. Would want to deal with her all the time – you know the job is going to be done. The guys on site were very … Continued
  • Tue, October 16, 2012 – Solutions Engineer – Distribution Solutions Company

    Tue, October 16, 2012 – Solutions Engineer – Distribution Solutions Company Our customer has asked us to pass on our thanks to Norman for his help and support at the commissioning last Tuesday.
  • Fri, October 3, 2014 – FM Specialist, Leading Furniture Retailer

    Fri, October 3, 2014 – FM Specialist, Leading Furniture Retailer I’d like to take this opportunity to thank you all at shentongroup for the recent support you gave at the ***** ***** Service Office to resolve the issue in a very prompt and professional manner.
  • Wed, July 06, 2011 – FM Manager – Telecomm Service Provider

    Wed, July 06, 2011 – FM Manager – Telecomm Service Provider The service provided by shentongroup’s has been first class.
  • Thurs, June 5, 2014 – Medical Research Company

    Thurs, June 5, 2014 – Medical Research Company Again, please pass along my thanks to Alex for staying on site to rectify the wiring issue for us & avoiding having to re-schedule a visit – very much appreciated. He was a pleasure to deal with, very professional and personable  
  • Fri, June 13, 2014 – Financial Director of Award winning Butcher

    Fri, June 13, 2014 – Financial Director of Award winning Butcher It’s been a pleasure working with your company and should you wish to use as a reference site in future, please don’t hesitate to contact us.
  • Thu, September 29, 2011 – Projects Manager MOD Site

    Thu, September 29, 2011 – Projects Manager MOD Site shentongroup site operatives were clean and tidy, courteous and professional in their conduct.
  • Mon, February 25th, 2013 – RAF Lossiemouth

    I would like to formally record my utmost satisfaction regarding the installation of the UPS at Lossiemouth. From the initial planning stages to the meticulous inspection prior to leaving site, the contractor you selected has provided excellent service. The installation meets all of our needs and has been planned, and installed in such a way … Continued