24/7 Emergency Call-Out

Home » Products & Services » Maintenance and Monitoring » CHP Maintenance Contracts

Maximise Efficiency, Minimise Downtime

Keep your Combined Heat and Power (CHP) systems running at peak performance with Shenton Group’s expert maintenance solutions. We provide comprehensive service and support for a wide range of CHP systems across the UK.

Why Choose Shenton Group for CHP Maintenance?

  • Specialist Expertise: Highly trained technicians and genuine parts for guaranteed reliability.
  • Comprehensive Coverage: All labour, consumables, and callouts included for predictable costs.
  • 24/7 Remote Monitoring: Proactive performance tracking with monthly reports.
  • Rapid Response: 4-hour remote support and next-day on-site engineer attendance with Infinium Premier.
  • Flexible Contracts: Transparent pricing based on run hours – pay only for what you use.
  • Risk-Free Operation: Lifetime warranty options and overhaul plans for maximum ROI.

Benefits for Your Business

  • Reduce Downtime: Continuous monitoring and fast response keep your CHP running.
  • Lower Costs: Consolidate multiple maintenance contracts into one trusted provider.
  • Boost Efficiency: Optimised performance means better energy savings and sustainability.
  • Peace of Mind: All operational risks sit with us, not you.

Our CHP Maintenance Solutions Include

  • Multi-brand CHP servicing and upgrades
  • Control panel modernisation for remote monitoring
  • End-to-end compliance and emissions testing
  • Flexible overhaul options for long-term asset protection

Compare Our CHP Maintenance Plans

CHP Maintenance Support FeaturesInfinium24Infinium Premier
Scheduled Visits
All Call Outs Included
All Service Visits
Extended Warranty
Parts Included
Consumables Included
Next Working Day Preliminary Response To Mission Critical Issues
4 Hour Preliminary Response To Mission Critical Issues
Next Day Site Attendance
Best Endeavour Site Attendance
24/7 Machine Data Collection
Permanently Live Remote Monitoring
Web-Based Client Interface

Ready to protect your CHP investment?

Get a tailored maintenance contract that guarantees reliability, efficiency, and cost control.

Contact Us

Our FAQ’s

  • D

    Derek Sidaway – Sedgwick International UK

    Professional, efficient, courteous, I cannot praise the company and the staff enough. Our project was to remove a generator and associated control equipment from site, couldn’t have gone any smoother!
  • A

    Andy Hughes, Chief Technology Officer – Intelligence Hosting Services Limited

    After having major issues with a so called “Generator Specialist” we needed to find a company that was competent in ensuring our backup power facilities were installed correctly as well as safe. After speaking with Shenton Group over the phone, an initial site survey was carried out along with the works that were needed to … Continued
  • P

    Paul Hamblyn – Managing Director and Chief Operating Officer of EuroSite Power.

    Shenton Group have been a trusted partner since 2012. Their knowledge of the TEDOM CHP product proved invaluable when commissioning this complex project for CEFAS (Centre for Environment, Fisheries and Aquaculture Science), helping us to achieve the objectives set by our client.”

Our Latest News

  • Case Study: Powering 150 Fibre Network Sites with Uninterrupted Power Solutions

    Location: NationwideClient: Leading National Fibre Network ProviderEnd User: Businesses and Consumers NationwideSector: Fibre Network Infrastructure Products/Services Used: Client Overview Our client is a leading national fibre network provider operating across 190+ sites. They deliver high-speed connectivity to businesses and consumers, relying on resilient power infrastructure to maintain continuous service availability. Their operations are critical to … Continued

  • Case Study: Shenton Group Provides Reliable Power to Global Biopharmaceutical Distribution Centres

    Sector: PharmaceuticalsLocation: Liverpool Products/ Services Background A global biopharmaceutical company, based in the north west of the UK, was expanding due to the increase in demand for pharmaceutical supplies during the COVID-19 pandemic. Further manufacturing and cold storage were required on-site, and temporary power was needed for this expansion. Project Overview Shenton Group was tasked … Continued

  • Case Study – Porton Science Park

    Client: Wiltshire CouncilSector: Local AuthorityLocation: Porton Down Products/Services Background Porton Science Park provides a platform for Science and Technology to innovate in an environment that welcomes and supports new business start ups. Working in partnership with Wiltshire council and DSTL (the Ministry of Defence’s Defence and Science Technology Laboratory), who are an existing customer, Shenton … Continued

  • Case Study: Amazon Distribution Centres

    Client: Amazon Direct Sector: Distribution Location: Tilbury Products/ Services Background Amazon Direct is one of the largest distributors in the UK with over 30 warehouses operating currently. In 2021 an unplanned service requirement arose in one of Amazon’s distribution centres, which resulted in the requirement for a rental generator. Shenton Group were asked to provide … Continued

  • Backup Generator Solution for Ilona Rose House

    Client: Gratte BrothersSector: Mixed-Use Development Location: Soho, London Products/Services Background Ilona Rose House, set in the heart of Soho, London, is a 31,0,00sqm new-build project spread over 13 floors, including four below ground. With a build cost of £100m, the development will contain shops, restaurants, bars, offices, residential apartments, a gallery and a nightclub. Shenton Group … Continued

  • Providing Power Continuity to Virgin Media

    The Virgin Media Technology Service Centre, a campus facility in Knowsley, UK, was subject to technical upgrading of its supportive infrastructure to better enhance the power resilience to the site.

    The existing Diesel Rotary Uninterruptible Power Supplies (DRUPS) technology became extremely expensive to maintain, leading to the decision to upgrade the equipment. Shenton Group was once again entrusted with this project due to an ongoing relationship with previous power installations for Virgin Media.