24/7 Emergency Call-Out

Dark Overlay

Government &
MOD

Home » Sectors and Case Studies » Government & MOD

Reliable Power Solutions for Government & Ministry of Defence

From local council offices and government agencies to MoD bases, power continuity is critical for security, compliance, and operational stability. Shenton Group has a long and proven history serving government-owned organisations and public sector services, delivering solutions that meet the highest standards of reliability and confidentiality.

Why Power Continuity Matters for Government & MoD

  • Ensure Operational Stability – Avoid downtime that disrupts essential services and critical infrastructure.
  • Meet Compliance and Security Standards – Adhere to stringent government and MoD regulations.
  • Support Sustainability Goals – Reduce carbon emissions and energy costs in line with environmental policies.

What Happens When the Power Stops?

Without reliable power, government and defence organisations face serious consequences:

  • Operational Downtime – Disrupted services, missed deadlines, and compromised security.
  • Equipment Damage – Sudden shutdowns can harm sensitive systems and critical infrastructure.
  • Security Risks – Loss of power can impact surveillance, communications, and emergency response.
  • Loss of Reputation – Failure to maintain continuity can erode public trust.
  • Energy Inefficiency – Rising costs without CHP optimisation.
  • Reduced Resilience – Inability to meet compliance and maintain operational readiness.

Our Expertise in Secure and Challenging Environments

Shenton Group has extensive experience working in high-security and complex locations, always in strict accordance with government and MoD health, safety, and security regulations. Our solutions are designed to deliver resilience and peace of mind for decision-makers responsible for critical operations.

Standby Generators, UPS Systems & Battery Storage

Our solutions include:

  • Standby Generators – Ensure power continuity during outages
  • Generator Hire – Provides temporary power for planned works or emergencies.
  • Uninterruptible Power Supply (UPS) – Ensures that there is no break in power, providing seamless protection for critical systems.
  • Battery Storage Solutions – Store energy for instant backup and support sustainability goals.
  • Power Call Emergency Generator Hire – Rapid response for urgent requirements.

Battery storage adds an extra layer of resilience, enabling facilities to store renewable energy, reduce reliance on the grid, and maintain uptime during transitions or outages.

CHP Maintenance and Efficiency

Combined Heat and Power (CHP) systems generate heat and electricity simultaneously, making them ideal for large government facilities with significant hot water demand. CHP can reduce carbon emissions by up to 30%, cut energy costs, and help meet sustainability targets.

At Shenton Group, we maintain and optimise CHP systems to ensure they deliver maximum efficiency and ROI—helping public sector organisations achieve greener energy and lower bills without compromising reliability.

Our Latest News

Contact Us
  • W

    Wed, March 15, 2017 – Systems Manager, British University

    Brilliant Stuff Stephanie and you are welcome, I must say you guys have always helped us in a crisis and that counts for a lot… …As usual let me known when you have a team ready for the Hawkeye installation.
  • E

    Engineer – Consulting Company

    Thank you to those involved in arranging the CPD carried out at our office yesterday. We found this CPD on CHPs to be very informative, and the presenter Marcus Dodswoth was very knowledgeable and approached the CPD with great professionalism and enthusiasm.
  • A

    Andy Hughes, Chief Technology Officer – Intelligence Hosting Services Limited

    After having major issues with a so called “Generator Specialist” we needed to find a company that was competent in ensuring our backup power facilities were installed correctly as well as safe. After speaking with Shenton Group over the phone, an initial site survey was carried out along with the works that were needed to … Continued
  • S

    Service Engineer – Healthcare Sector

    I can’t emphasis how happy we are with the professional and extremely quick manor everything has been dealt with.
  • S

    Sun, September 11, 2011 – Facilities Manager Software Company – Reading

    Sun, September 11, 2011 – Facilities Manager Software Company – Reading shentongroup engineers were exceptionally clean and tidy and carried out a quality installation. The project was completed on time and was good value for money.
  • W

    Wed, February 03, 2016 – Solutions Architect, Major Energy Management Company

    Wed, February 03, 2016 – Solutions Architect, Major Energy Management Company Roland, you are an absolute star – I’ll have a read through all this but I cannot thank you enough for your efforts – I am truly grateful… Thanks again and I’ll give this a read through – but you are the best!
  • M

    Michael Edgley-Pyshorn – Private Home Owner

    I wanted to express my appreciation and gratitude for the way that Roland Tayor dealt with my problem this morning. We purchased a M8 Helper generator from Scorpion Power Systems in 2003, and today I had an error code on the system that I did not understand.  Thankfully Roland was able to dig into the … Continued
  • T

    Tue, December 04, 2012 – Electrical Reseller

    Tue, December 04, 2012 – Electrical Reseller I like working with Shenton. The engineers always turn up and do what they say they are going to do. What a delightful surprise – the shentongroup hampers are a legend
  • F

    Fri, June 13, 2014 – Financial Director of Award winning Butcher

    Fri, June 13, 2014 – Financial Director of Award winning Butcher It’s been a pleasure working with your company and should you wish to use as a reference site in future, please don’t hesitate to contact us.
  • M

    Martina – Healthcare

    Shenton Group supplied and installed a standby generator at my Company HQ and have been responsible for maintenance and refuelling. The service received has been excellent since the outset, both in terms of planned works and emergency repairs, the engineers have been reliable and effective, and all of the Shenton Group team have worked well … Continued
  • T

    Thu, November 01, 2012 – Electrical Contractor

    Thu, November 01, 2012 – Electrical Contractor Please thank your engineer for his assistance yesterday with rectifying the phase rotation fault. Thank you for all your efforts with the quick turnaround, the client is very happy and pleased with the response to their demands
  • S

    Sat, June 11, 2011 – Senior Building Services Engineer – Construction Comapany

    Sat, June 11, 2011 – Senior Building Services Engineer – Construction Comapany When the power outaged occurred the generator coped very well. shentongroup did an excellent job and I have no hesitation in recommending the company to others and using it again as the need arises.