24/7 Emergency Call-Out

Dark Overlay

Infrastructure &
Utilities

Home » Sectors and Case Studies » Infrastructure & Utilities

Power Continuity for
Infrastructure & Utilities

In infrastructure and utilities, power failure isn’t just disruptive—it can halt essential services, breach regulatory compliance, and impact thousands of customers. Shenton Group delivers robust backup power and CHP solutions that ensure maximum uptime, reduce energy costs, and support sustainability across complex, high-demand environments. Whether you’re managing pumping stations, treatment plants, or remote utility sites, our systems keep operations running smoothly and communities connected.

What’s at Risk Without Reliable Power?

Utility and infrastructure providers face unique challenges when power fails:

  • Regulatory Breaches – Missed compliance targets and costly penalties.
  • Remote Site Vulnerability – Unplanned outages in hard-to-reach areas disrupt essential services.
  • Service Interruption – Pumping stations, treatment plants, and critical networks go offline.
  • Customer Impact – Loss of water, energy, or connectivity leads to complaints and reputational damage.
  • Environmental Pressure – Missed sustainability and emissions targets without CHP optimisation.
  • Operational Downtime – Delays to maintenance, upgrades, and emergency response.


Tailored Power Solutions for Utilities & Infrastructure

We engineer and maintain power systems that meet the demands of this sector:

  • Single & Three Phase Generators from 300kVA to 3200kVA.
  • Generator Hire: Ideal for temporary works, upgrades, and emergency response.
  • CHP Systems: Comprehensive maintenance that ensures ultimate uptime, greener energy with reduced heat and electricity costs.
  • Powercall: 24/7 emergency generator rental
  • Prime Power Installations: Long-term solutions for remote or off-grid sites.
  • Full Compliance Support: Designed to meet emissions reduction schemes and regulatory standards.

Proven Success in Infrastructure & Utilities

We’ve supported major utility providers and infrastructure projects with reliable power:

  • National Generator Maintenance Support for Gas Network Provider
    Provided ongoing generator maintenance to ensure uninterrupted power for critical gas network operations. Read full case study
  • Turnkey Generator Solution for Welsh Water
    Designed and implemented a complete generator system for a major pumping station, ensuring compliance and reliability. Read full case study
  • DEFRA-Compliant Fuel Pipework for Thames Water’s New Diesel Generators
    Ensured compliance and safety for fuel systems supporting critical water infrastructure.
    Read full case study

Why Infrastructure Leaders Trust Shenton Group

  • Decades of Proven Expertise
    Trusted power solutions for utilities, infrastructure, and critical services.
  • Certified Quality & Compliance
    NICEIC and ISO-approved installations, meeting DEFRA and emissions standards.
  • End-to-End Resilience
    Generators, UPS, CHP, battery storage – plus 24/7 emergency cover via Power Call.
  • Rapid Nationwide Response
    Fast deployment and full UK coverage with sector-specific technical support.
  • Sustainable & Cost-Efficient Solutions
    CHP optimisation and battery storage to cut carbon and energy costs
  • Advanced Monitoring & SLA Protection
    24/7 remote insights, flexible service levels, and guaranteed SLA compliance.

Our Latest News

  • Paul Hamblyn, Managing Director of EuroSite Power and Russell Phillips, VP Facilities and Development of Celtic Manor

    Celtic Manor is a key client for EuroSite Power, and so equipment performance and reliability are a priority. The TEDOM product, supported by Shenton Group was an ideal choice and has delivered consistent results both for us and our customer. – Paul Hamblyn The solution has provided us with immediate cost and carbon emission savings … Continued
  • Thu, April 25, 2013 – Director, Computer Services Company

    Thu, April 25, 2013 – Director, Computer Services Company The install all went well, your guy was great, very helpfull.
  • Thurs, June 5, 2014 – Medical Research Company

    Thurs, June 5, 2014 – Medical Research Company Again, please pass along my thanks to Alex for staying on site to rectify the wiring issue for us & avoiding having to re-schedule a visit – very much appreciated. He was a pleasure to deal with, very professional and personable  
  • Andy Hughes, Chief Technology Officer – Intelligence Hosting Services Limited

    After having major issues with a so called “Generator Specialist” we needed to find a company that was competent in ensuring our backup power facilities were installed correctly as well as safe. After speaking with Shenton Group over the phone, an initial site survey was carried out along with the works that were needed to … Continued
  • Wed, August 31, 2016 – Project Manager, M&E Company

    Wed, August 31, 2016 – Project Manager, M&E Company I understand everything was up and running by 8:15pm, which was absolutely brilliant and the ***** Director was very pleased.  Thanks for all your help last night; I know it was very last minute. We will be forwarding the official order this morning.  I believe its things … Continued
  • Mon, November 30, 2015 – Project Manager, Building Services Company

    Mon, November 30, 2015 – Project Manager, Building Services Company Can you please thank all you team for delivering this project yesterday to a successful conclusion. Our client and myself really appreciate all the efforts put in to this project.
  • Fri, July 22, 2011 – Contracts Manager – Telecomm FM provider.

    Fri, July 22, 2011 – Contracts Manager – Telecomm FM provider. We went out to tender but chose shentongroup as we were particularly impressed with the fact they immediately understood what was required and took the time to understand how we wanted the contract to work. The company has national coverage and offers far more … Continued
  • Tue, July 30, 2013 – Service Sales Engineer, Contract Reseller Company

    Tue, July 30, 2013 – Service Sales Engineer, Contract Reseller Company Our Client has emailed – he wants me to pass on a big thank you to James and everyone else involved in the Gene hire over the last week.
  • Mon, June 20, 2016 – Regional Manager, Mechanical and Electrical Company

    Mon, June 20, 2016 – Regional Manager, Mechanical and Electrical Company As per our email exchange on Friday, many thanks once again for sorting out this difficult situation, once again shentongroup have demonstrated excellent customer care in what was a difficult situation for us all.  We have a few projects starting to come on stream in … Continued
  • Thurs, August 06, 2015 – Electrical Engineer, Consultant Company

    Thurs, August 06, 2015 – Electrical Engineer, Consultant Company Thanks. I cannot speak highly enough of both [CPD] presentations from Richard.
  • Wed, October 12, 2011 – Manager – Health and Fitness Club

    Wed, October 12, 2011 – Manager – Health and Fitness Club When due to our increasing growth we needed to open a second Health and Fitness centre, shentongroup provided us with a clean…
  • Project Manager – Hospital

    Generator picked up, thank you for all your help and support througout the hire, the generator has been a god send.

Secure Your Power, Protect Your Service

Let’s design a power solution that keeps your infrastructure running, without interruption. Speak to the UK’s leading technical experts today.