24/7 Emergency Call-Out

Dark Overlay

Science &
Research

Home » Sectors and Case Studies » Science & Research

Power Continuity for Science & Research

Precision Without Interruption

At the forefront of cutting-edge research and development, Shenton Group provides reliable power solutions to keep some of the UK’s most essential programmes in motion. From laboratories to research campuses and science parks, our generator and UPS systems ensure uninterrupted operations where precision, safety, and uptime are non-negotiable.

What’s at Risk When Power Fails in Scientific Environments?

  • Experiment Disruption: Power loss mid-process can invalidate results and waste valuable resources. Chillers can lose power, spoiling materials and samples
  • Data Loss: Sensitive research data and analytics systems are vulnerable to corruption or loss.
  • Equipment Damage: High-spec lab instruments require stable power to avoid costly damage.
  • Funding & Compliance Risks: Interruptions can breach grant conditions or regulatory standards.
  • Reputation Impact: Delays or failures can affect partnerships, publications, and global standing.

Why Scientists and Innovators Trust Shenton Group

  • Over 40 years of experience in critical power environments.
  • NICEIC and ISO-certified installations.
  • Trusted by science parks, universities, and research bodies.
  • Fast emergency response and nationwide coverage.
  • Dedicated support team with sector-specific expertise.

Our Latest News

  • T

    Thu, November 01, 2012 – TSO Mechanical & Electrical, FM Company

    Thu, November 01, 2012 – TSO Mechanical & Electrical, FM Company Please can you pass on my thanks to Alex and James for their hard work and professionalism at all times throughout the job. I know working on MOD sites can be a bit tricky at times, with regulations, passes etc but a no times … Continued
  • P

    Project Manager – Hospital

    Generator picked up, thank you for all your help and support througout the hire, the generator has been a god send.
  • T

    Thu, November 01, 2012 – Electrical Contractor

    Thu, November 01, 2012 – Electrical Contractor Please thank your engineer for his assistance yesterday with rectifying the phase rotation fault. Thank you for all your efforts with the quick turnaround, the client is very happy and pleased with the response to their demands
  • F

    Fri, June 13, 2014 – Financial Director of Award winning Butcher

    Fri, June 13, 2014 – Financial Director of Award winning Butcher It’s been a pleasure working with your company and should you wish to use as a reference site in future, please don’t hesitate to contact us.
  • T

    Tue, October 16, 2012 – Electrical Reseller

    Tue, October 16, 2012 – Electrical Reseller When I have a tricky job that needs doing I call shentongroup.
  • T

    Thu, November 01, 2012 – Renewable Energy Research Partner at Property Management Company

    Thu, November 01, 2012 – Renewable Energy Research Partner at Property Management Company You certainly have a very impressive set up with lots of happy looking people to assist you in your work.
  • T

    Tue, December 04, 2012 – Senior Service Manager, Manufacturing Company

    Tue, December 04, 2012 – Senior Service Manager, Manufacturing Company Thank you very much for your help and organization last week.
  • T

    Tues, October 28, 2014 – Manager, Important Historical Building

    Tues, October 28, 2014 – Manager, Important Historical Building I’d would like to thank you and the Shenton Group for acting so quickly in removing the generator from site. This has enabled the restoration works at ********* to take place and with a few days grace so we are all delighted. I understand that the … Continued
  • V

    Vittorio Frosini – EngTech TMIET Maintenance Manager

    We had an emergency with one of our generators, and Shenton were fantastic; they responded really quickly, sorted out the issue efficiently, and clearly explained what had gone wrong. During their regular service visit, their technician Joseph was great too. He was very knowledgeable and professional, took the time to explain what was recommended, and … Continued
  • T

    Thu, June 30, 2011 – Electrical Design Engineer at the University of East Anglia

    Thu, June 30, 2011 – Electrical Design Engineer at the University of East Anglia We have received excellent service from shentongroup, which was able to advise us on the best possible way of ensuring that all our essential equipment could continue functioning during powercuts.
  • T

    Tue, November 08, 2011 – Electrical Design Engineer – University

    Tue, November 08, 2011 – Electrical Design Engineer – University We have received excellent service from shentongroup, which was able to advise us on the best possible way of ensuring that all our essential equipment could continue functioning during powercuts
  • T

    Thu, November 01, 2012 – Technical Sales Engineer, Reseller

    Thu, November 01, 2012 – Technical Sales Engineer, Reseller Thank you for the professional quote sent in the post and the mints to go with. I’ve never seen anyone in the years I’ve been in this industry, send a quote quite like this. If the quotes are this good, service must be outstanding.

Secure Your Power, Protect Your Progress

Let’s design a power solution that keeps your research moving, without interruption. Speak to the UK’s leading technical experts today.