24/7 Emergency Call-Out

Dark Overlay

Education

Reliable Power Solutions for Education Facilities

Whether you manage a school or a large educational campus, continuous heat and power is essential for safety, comfort, and uninterrupted learning. Power failures can disrupt classes, damage equipment, and create compliance risks – issues no Facilities Manager wants to face.

Why Power Continuity Matters for Education

  • Protect Learning Environments – Ensure classrooms, labs, and IT systems stay operational.
  • Meet Compliance Standards – Avoid costly downtime and maintain health and safety obligations.
  • Peace of Mind for FM Teams – Reliable backup solutions reduce risk and stress for on-site managers.

Optimising CHP Systems for Efficiency

Combined Heat and Power (CHP) systems generate heat and electricity simultaneously, making them ideal for larger educational sites with significant hot water demand. Campuses with swimming pools, sports facilities, or student accommodation often benefit most from CHP technology for heating and power.

These systems lower energy costs, can reduce carbon emissions by up to 30%, and help meet sustainability targets.

At Shenton Group, we maintain and optimise CHP systems to ensure they operate at peak efficiency and deliver the highest possible return on investment. For educational facilities running long hours, this means lower bills, greener energy, and reliable performance without compromise.

Backup Power Solutions

If the unthinkable happens and mains power fails, having a backup generator system ensures your site isn’t left in the dark. We design robust solutions for resilience and compliance, giving FM teams confidence that critical life safety services such as emergency lighting and lifts will continue to operate.

When a permanent generator isn’t required, our Power Call emergency generator rental connection service provides rapid response and peace of mind.

Ready to Protect Your Campus?

Contact Us

Our Latest News

  • Case Study: Powering 150 Fibre Network Sites with Uninterrupted Power Solutions

    Location: NationwideClient: Leading National Fibre Network ProviderEnd User: Businesses and Consumers NationwideSector: Fibre Network Infrastructure Products/Services Used: Client Overview Our client is a leading national fibre network provider operating across 190+ sites. They deliver high-speed connectivity to businesses and consumers, relying on resilient power infrastructure to maintain continuous service availability. Their operations are critical to … Continued

  • Case Study: Shenton Group Provides Reliable Power to Global Biopharmaceutical Distribution Centres

    Sector: PharmaceuticalsLocation: Liverpool Products/ Services Background A global biopharmaceutical company, based in the north west of the UK, was expanding due to the increase in demand for pharmaceutical supplies during the COVID-19 pandemic. Further manufacturing and cold storage were required on-site, and temporary power was needed for this expansion. Project Overview Shenton Group was tasked … Continued

  • Case Study – Porton Science Park

    Client: Wiltshire CouncilSector: Local AuthorityLocation: Porton Down Products/Services Background Porton Science Park provides a platform for Science and Technology to innovate in an environment that welcomes and supports new business start ups. Working in partnership with Wiltshire council and DSTL (the Ministry of Defence’s Defence and Science Technology Laboratory), who are an existing customer, Shenton … Continued

  • Case Study: Amazon Distribution Centres

    Client: Amazon Direct Sector: Distribution Location: Tilbury Products/ Services Background Amazon Direct is one of the largest distributors in the UK with over 30 warehouses operating currently. In 2021 an unplanned service requirement arose in one of Amazon’s distribution centres, which resulted in the requirement for a rental generator. Shenton Group were asked to provide … Continued

  • Backup Generator Solution for Ilona Rose House

    Client: Gratte BrothersSector: Mixed-Use Development Location: Soho, London Products/Services Background Ilona Rose House, set in the heart of Soho, London, is a 31,0,00sqm new-build project spread over 13 floors, including four below ground. With a build cost of £100m, the development will contain shops, restaurants, bars, offices, residential apartments, a gallery and a nightclub. Shenton Group … Continued

  • Providing Power Continuity to Virgin Media

    The Virgin Media Technology Service Centre, a campus facility in Knowsley, UK, was subject to technical upgrading of its supportive infrastructure to better enhance the power resilience to the site.

    The existing Diesel Rotary Uninterruptible Power Supplies (DRUPS) technology became extremely expensive to maintain, leading to the decision to upgrade the equipment. Shenton Group was once again entrusted with this project due to an ongoing relationship with previous power installations for Virgin Media.

  • W

    Wed, March 15, 2017 – Systems Manager, British University

    Brilliant Stuff Stephanie and you are welcome, I must say you guys have always helped us in a crisis and that counts for a lot… …As usual let me known when you have a team ready for the Hawkeye installation.
  • T

    Thu, September 29, 2011 – Projects Manager MOD Site

    Thu, September 29, 2011 – Projects Manager MOD Site shentongroup site operatives were clean and tidy, courteous and professional in their conduct.
  • T

    Tue, October 16, 2012 – Electrical Reseller

    Tue, October 16, 2012 – Electrical Reseller When I have a tricky job that needs doing I call shentongroup.
  • P

    Private Owner – End User

    …I will use your firm again and will recommend you to anybody for honest and reliable service…
  • F

    Fri, September 30th, 2016 – Project Manager, Infrastructure Company

    I wanted to thank you for your collaborative and reactive approach throughout the ******* Generator Controller replacement project.  I’d be grateful if you could also pass on myself and Peter’s thanks to the guys in the field who went out of their way to be flexible and help us fit in with ******* requirements and other … Continued
  • M

    Mon, March 27, 2017 – Manager, Data Management company

    Good afternoon Terry, I just wanted to pay you an email to give out thanks for the work yourself and Shenton have done with regards to Saturday’s UPS install here at ***********. The Saturday works went ahead as planned and on schedule at 7am our side and by 8am Dan, Callum & Vic had the … Continued
  • T

    Thurs, June 5, 2014 – Medical Research Company

    Thurs, June 5, 2014 – Medical Research Company Again, please pass along my thanks to Alex for staying on site to rectify the wiring issue for us & avoiding having to re-schedule a visit – very much appreciated. He was a pleasure to deal with, very professional and personable  
  • S

    Sun, July 31, 2013 – Construction Project Manager for UK and Ireland at Large Retail Property Investment Company

    Wed, July 31, 2013 – Construction Project Manager for UK and Ireland at Large Retail Property Investment Company I have had the chance to review the installation works on the new SO generator; and wanted to say that I am happy with the standard of works. Walking the installation, everything looks to be good and … Continued
  • T

    Tue, December 04, 2012 – Electrical Reseller

    Tue, December 04, 2012 – Electrical Reseller I like working with Shenton. The engineers always turn up and do what they say they are going to do. What a delightful surprise – the shentongroup hampers are a legend
  • T

    Tue, November 08, 2011 – Engineer – Insurance Company

    Tue, November 08, 2011 – Engineer – Insurance Company It is very helpful to have an organisation that can provide us with an integrated service that combines the supply of standby generators with maintenance.  
  • S

    Sat, October 01, 2011 – IT Manager, Lift Manufacturers

    Sat, October 01, 2011 – IT Manager, Lift Manufacturers The installation of the air conditioning was completed on time and to our complete satisfaction.
  • W

    Wed, July 24, 2013 – Director, Building Company

    Wed, July 24, 2013 – Director, Building Company I can confirm we were more than happy with your sevice.