24/7 Emergency Call-Out

Dark Overlay

Education

Reliable Power Solutions for Education Facilities

Whether you manage a school or a large educational campus, continuous heat and power are essential for safety, comfort, and uninterrupted learning. Power failures can disrupt classes, damage equipment, and create compliance risks that no Facilities Manager wants to face. We’ve delivered standby generator and CHP solutions for universities including Exeter, Cambridge, Canterbury Christ Church and East Anglia. 

Why Power Continuity Matters for Education

  • Protect Learning Environments – Ensure classrooms, labs, and IT systems stay operational.
  • Meet Compliance Standards – Avoid costly downtime and maintain health and safety obligations.
  • Peace of Mind for FM Teams – Reliable backup solutions reduce risk and stress for on-site managers.

Optimising CHP Systems for Efficiency

Combined Heat and Power (CHP) systems generate heat and electricity simultaneously, making them ideal for larger educational sites with significant hot water demand. Campuses with swimming pools, sports facilities, or student accommodation often benefit most from CHP technology for heating and power.

These systems lower energy costs, can reduce carbon emissions by up to 30%, and help meet sustainability targets.

At Shenton Group, we maintain and optimise CHP systems to ensure they operate at peak efficiency and deliver the highest possible return on investment. For educational facilities running long hours, this means lower bills, greener energy, and reliable performance without compromise.

Power for University Campuses & Student Accommodation

University estates carry particular demands worth naming explicitly: large-scale student accommodation with continuous hot water demand, research facilities requiring uninterrupted power (see our Science & Research page), and phased construction programmes that need power infrastructure to keep pace with new buildings coming online. We’ve delivered: 

  • A CHP solution for the University of Exeter’s East Park development, providing 100 standard bedrooms and 504 en-suite rooms with efficient heat and power as the campus expanded 
  • A generator and CHP package for the University of Cambridge’s £79m Project Capella research laboratory 
  • A CHP solution for Canterbury Christ Church University’s new halls of residence, supporting a university with over 18,000 enrolled students 
  • Standby generator power for the University of East Anglia 

F&Qs

Backup Power Solutions

If the unthinkable happens and mains power fails, having a backup generator system ensures your site isn’t left in the dark. We design robust solutions for resilience and compliance, giving FM teams confidence that critical life safety services such as emergency lighting and lifts will continue to operate.

When a permanent generator isn’t required, our Power Call emergency generator rental connection service provides rapid response and peace of mind.

Ready to Protect Your Campus?

Contact Us

Our Latest News

  • Wed, March 15, 2017 – Systems Manager, British University

    Brilliant Stuff Stephanie and you are welcome, I must say you guys have always helped us in a crisis and that counts for a lot… …As usual let me known when you have a team ready for the Hawkeye installation.
  • Private Owner – End User

    …I will use your firm again and will recommend you to anybody for honest and reliable service…
  • Wed, January 14, 2015 – Owner, Large Farm

    Wed, January 14, 2015 – Owner, Large Farm All I want to add is that we were highly impressed with the professionalism of your team in dealing with the installation. It really is a magnificent piece of kit! (And it’s got a Perkins Diesel engine – the sound of which I’m very familiar with!) Many thanks … Continued
  • Alex Robinson – AD Plant Manager

    I have found Shenton Group to be a thoroughly professional organisation. Running an AD plant is a 24/7 operation, with constant oversight required. However, even though the CHPs are one of the most critical parts of the AD plant, I have no concerns about their operation, due to the efficiency of the support service provided.
  • Tue, October 16, 2012 – Solutions Engineer – Distribution Solutions Company

    Tue, October 16, 2012 – Solutions Engineer – Distribution Solutions Company Our customer has asked us to pass on our thanks to Norman for his help and support at the commissioning last Tuesday.
  • Fri, April 26, 2013 – Facilities Maintenance Contract Manager, County Council

    Fri, April 26, 2013 – Facilities Maintenance Contract Manager, County Council Can you please give my thanks to the shentongroup engineers for successfully completing the generator panel modifications and testing of the system, I would like to thank Paul in particular for coping with the challenging situation under pressure, the shentongroup engineers performed excellently and … Continued
  • Mon, February 9, 2015 – Engineering Manager, Product Testing Laboratory

    Mon, February 9, 2015 – Engineering Manager, Product Testing Laboratory Thanks. I must say we were very impressed with how your company reacted to our requirement [Rental]. Myself and our client, *******, were particularly impressed with Tom. He was very polite, positive with good technical knowledge about the equipment and very helpful. A credit to … Continued
  • Building Service Manager – Large M&E Company

    Dear all, I am pleased to announce that ****** have successful handed over the ******* project within our contract date. It is a massive achievement and I would like to take this opportunity to thank you all for the time and effort you have all put in. I’m sure we would of not achieved it … Continued
  • Service Manager – Real Estate

    I would just like to pass on from both Mike, and myself our appreciation, and sincere thanks to you and the rest of Shenton Team. During the evening, and our day spent factory testing the whole ethos of the group shone through, and for QVC it is a real pleasure to be working in conjunction … Continued
  • Tues, July 22, 2014 – Electrical Supervisor, Electrical and Mechanical Contractors

    Tues, July 22, 2014 – Electrical Supervisor, Electrical and Mechanical Contractors I would like to add that your engineer Steve was most helpful today, it,s nice to work with someone who is both professional, courteous & obliging.
  • Tue, May 07, 2013 – Director, Business Solutions Company

    Tue, May 07, 2013 – Director, Business Solutions Company Thanks very much for the prompt service. Good as ever, please pass on our thanks to your management team and particularly for the work of yourself and your engineer.
  • Tues, January 05, 2016 – Electrical Engineer, Consulting Engineers

    Tues, January 05, 2016 – Electrical Engineer, Consulting Engineers Happy new year to you and many thanks for sending the CPD certificates. Please pass on our appreciation to Richard for what was a truly informative and beneficial CPD seminar.