24/7 Emergency Call-Out

Dark Overlay

Education

Home » Sectors and Case Studies » Education

Reliable Power Solutions for Education Facilities

Whether you manage a school or a large educational campus, continuous heat and power is essential for safety, comfort, and uninterrupted learning. Power failures can disrupt classes, damage equipment, and create compliance risks issues no Facilities Manager wants to face. We’ve delivered standby generator and CHP solutions for universities including Exeter, Cambridge, Canterbury Christ Church and East Anglia. 

Why Power Continuity Matters for Education

  • Protect Learning Environments – Ensure classrooms, labs, and IT systems stay operational.
  • Meet Compliance Standards – Avoid costly downtime and maintain health and safety obligations.
  • Peace of Mind for FM Teams – Reliable backup solutions reduce risk and stress for on-site managers.

Optimising CHP Systems for Efficiency

Combined Heat and Power (CHP) systems generate heat and electricity simultaneously, making them ideal for larger educational sites with significant hot water demand. Campuses with swimming pools, sports facilities, or student accommodation often benefit most from CHP technology for heating and power.

These systems lower energy costs, can reduce carbon emissions by up to 30%, and help meet sustainability targets.

At Shenton Group, we maintain and optimise CHP systems to ensure they operate at peak efficiency and deliver the highest possible return on investment. For educational facilities running long hours, this means lower bills, greener energy, and reliable performance without compromise.

Power for University Campuses & Student Accommodation

University estates carry particular demands worth naming explicitly: large-scale student accommodation with continuous hot water demand, research facilities requiring uninterrupted power (see our Science & Research page), and phased construction programmes that need power infrastructure to keep pace with new buildings coming online. We’ve delivered: 

  • A CHP solution for the University of Exeter’s East Park development, providing 100 standard bedrooms and 504 en-suite rooms with efficient heat and power as the campus expanded 
  • A generator and CHP package for the University of Cambridge’s ÂŁ79m Project Capella research laboratory 
  • A CHP solution for Canterbury Christ Church University’s new halls of residence, supporting a university with over 18,000 enrolled students 
  • Standby generator power for the University of East Anglia 

F&Qs

Backup Power Solutions

If the unthinkable happens and mains power fails, having a backup generator system ensures your site isn’t left in the dark. We design robust solutions for resilience and compliance, giving FM teams confidence that critical life safety services such as emergency lighting and lifts will continue to operate.

When a permanent generator isn’t required, our Power Call emergency generator rental connection service provides rapid response and peace of mind.

Ready to Protect Your Campus?

Contact Us

Our Latest News

  • Wed, September 18, 2013 – Prepayment Operations & Client Manager for a Global Technology Company

    Wed, September 18, 2013 – Prepayment Operations & Client Manager for a Global Technology Company Just to let you know that all went well and install is completed.  Thanks for a strerling job once again.  Pass my thanks onto Alex and Andrew.
  • Thu, April 25, 2013 – Electrical Reseller

    Thu, April 25, 2013 – Electrical Reseller Thanks for the efficient service at the University yesterday; the customer was delighted with how it went.
  • Wed, July 24, 2013 – Director, Building Company

    Wed, July 24, 2013 – Director, Building Company I can confirm we were more than happy with your sevice.
  • Mon, February 04, 2013 – Projects Manager, Modular Solutions

    Mon, February 04, 2013 – Projects Manager, Modular Solutions I can confirm all went very very well – client very pleased. Well done to James Norman who managed excellently without a hitch, communicating well throughout
  • IT Manager – Solicitors

    As an IT Manager within a busy solicitors’ practice, uninterrupted power is critical to our systems, data access, and client service. Although power outages are infrequent, Power Call provides a cost-effective and reassuring solution that ensures full business continuity if the worst should happen. Their service gives us confidence that, in the event of an … Continued
  • Thurs, March 30, 2017 – PA & Team Secretary, M&E Company

    I just wanted to send an email with the feedback from attendees for the Combined Heat & Power CPD yesterday. Staff have said it was an excellent example of what a CPD session should be (by all accounts they have had some rather poor one’s in the past) and they asked me to feed this … Continued
  • Tues, January 20, 2015 – Senior Electrical Engineer, University

    Tues, January 20, 2015 – Senior Electrical Engineer, University Just to say the presenter Richard, was knowledgeable, humorous and pitched at the right pace. This was the best CPD I have attended in a few years.
  • Tues, October 28, 2014 – Manager, Important Historical Building

    Tues, October 28, 2014 – Manager, Important Historical Building I’d would like to thank you and the Shenton Group for acting so quickly in removing the generator from site. This has enabled the restoration works at ********* to take place and with a few days grace so we are all delighted. I understand that the … Continued
  • Martina – Healthcare

    Shenton Group supplied and installed a standby generator at my Company HQ and have been responsible for maintenance and refuelling. The service received has been excellent since the outset, both in terms of planned works and emergency repairs, the engineers have been reliable and effective, and all of the Shenton Group team have worked well … Continued
  • Tues, May 12, 2015 – Managing Director, Leading UK Data Centre

    Tues, May 12, 2015 – Managing Director, Leading UK Data Centre Honestly it has been a pleasure working with Shenton. We have had several ‘bad ones’ in other contracts throughout our build but your guys have been on top form. We will be using you again for additional generator sets and maintenance in the future.
  • Fri, July 25, 2014 – Tyre Specialists

    Fri, July 25, 2014 – Tyre Specialists Very happy with your company, we have a lot of power outages where we are and your generators have never failed to start, been excellent and the service is good. Don’t worry I would never think of going anywhere else when other project arise.
  • Tue, July 30, 2013 – Service Sales Engineer, Contract Reseller Company

    Tue, July 30, 2013 – Service Sales Engineer, Contract Reseller Company Our Client has emailed – he wants me to pass on a big thank you to James and everyone else involved in the Gene hire over the last week.