24/7 Emergency Call-Out

Dark Overlay

Education

Reliable Power Solutions for Education Facilities

Whether you manage a school or a large educational campus, continuous heat and power are essential for safety, comfort, and uninterrupted learning. Power failures can disrupt classes, damage equipment, and create compliance risks that no Facilities Manager wants to face. We’ve delivered standby generator and CHP solutions for universities including Exeter, Cambridge, Canterbury Christ Church and East Anglia. 

Why Power Continuity Matters for Education

  • Protect Learning Environments – Ensure classrooms, labs, and IT systems stay operational.
  • Meet Compliance Standards – Avoid costly downtime and maintain health and safety obligations.
  • Peace of Mind for FM Teams – Reliable backup solutions reduce risk and stress for on-site managers.

Optimising CHP Systems for Efficiency

Combined Heat and Power (CHP) systems generate heat and electricity simultaneously, making them ideal for larger educational sites with significant hot water demand. Campuses with swimming pools, sports facilities, or student accommodation often benefit most from CHP technology for heating and power.

These systems lower energy costs, can reduce carbon emissions by up to 30%, and help meet sustainability targets.

At Shenton Group, we maintain and optimise CHP systems to ensure they operate at peak efficiency and deliver the highest possible return on investment. For educational facilities running long hours, this means lower bills, greener energy, and reliable performance without compromise.

Power for University Campuses & Student Accommodation

University estates carry particular demands worth naming explicitly: large-scale student accommodation with continuous hot water demand, research facilities requiring uninterrupted power (see our Science & Research page), and phased construction programmes that need power infrastructure to keep pace with new buildings coming online. We’ve delivered: 

  • A CHP solution for the University of Exeter’s East Park development, providing 100 standard bedrooms and 504 en-suite rooms with efficient heat and power as the campus expanded 
  • A generator and CHP package for the University of Cambridge’s £79m Project Capella research laboratory 
  • A CHP solution for Canterbury Christ Church University’s new halls of residence, supporting a university with over 18,000 enrolled students 
  • Standby generator power for the University of East Anglia 

F&Qs

Backup Power Solutions

If the unthinkable happens and mains power fails, having a backup generator system ensures your site isn’t left in the dark. We design robust solutions for resilience and compliance, giving FM teams confidence that critical life safety services such as emergency lighting and lifts will continue to operate.

When a permanent generator isn’t required, our Power Call emergency generator rental connection service provides rapid response and peace of mind.

Ready to Protect Your Campus?

Contact Us

Our Latest News

  • Director of Property, Leading Healthcare Provider

    I am the Director of Property for **********, operating *** residential nursing homes across the UK. For around six years, Power Call has provided outstanding emergency generator support, now covering over 80 of our homes, with 30 more planned next year. Their service is exceptional—reliable, responsive, and consistently exceeding expectations, regularly delivering, installing, and commissioning … Continued
  • Tue, August 16, 2011 – Finance Director – Care Home Group

    Tue, August 16, 2011 – Finance Director – Care Home Group shentongroup’s Power Call service is a cost effective solution to providing standby power for our Care Home
  • Service Manager – Real Estate

    I would just like to pass on from both Mike, and myself our appreciation, and sincere thanks to you and the rest of Shenton Team. During the evening, and our day spent factory testing the whole ethos of the group shone through, and for QVC it is a real pleasure to be working in conjunction … Continued
  • Fri, April 26, 2013 – Facilities Maintenance Contract Manager, County Council

    Fri, April 26, 2013 – Facilities Maintenance Contract Manager, County Council Can you please give my thanks to the shentongroup engineers for successfully completing the generator panel modifications and testing of the system, I would like to thank Paul in particular for coping with the challenging situation under pressure, the shentongroup engineers performed excellently and … Continued
  • Wed, August 31, 2016 – Project Manager, M&E Company

    Wed, August 31, 2016 – Project Manager, M&E Company I understand everything was up and running by 8:15pm, which was absolutely brilliant and the ***** Director was very pleased.  Thanks for all your help last night; I know it was very last minute. We will be forwarding the official order this morning.  I believe its things … Continued
  • Tue, September 27, 2016 – Director, Electrical Services Company

    Thank you, the client and ourselves are pleased with your installation
  • Fri, April 26, 2013 – Electrical Contractor

    Fri, April 26, 2013 – Electrical Contractor We are very happy with your service and have no suggestions for improvement everything went as planned with no hiccups. Thank you for your efforts.
  • Thu, September 29, 2011 – Projects Manager MOD Site

    Thu, September 29, 2011 – Projects Manager MOD Site shentongroup site operatives were clean and tidy, courteous and professional in their conduct.
  • Wed, September 18, 2013 – Prepayment Operations & Client Manager for a Global Technology Company

    Wed, September 18, 2013 – Prepayment Operations & Client Manager for a Global Technology Company Just to let you know that all went well and install is completed.  Thanks for a strerling job once again.  Pass my thanks onto Alex and Andrew.
  • Sat, October 01, 2011 – IT Manager, Lift Manufacturers

    Sat, October 01, 2011 – IT Manager, Lift Manufacturers The installation of the air conditioning was completed on time and to our complete satisfaction.
  • Wed, June 10, 2015 – Electrical Project Manager, Large Engineering Services Company

    Wed, June 10, 2015 – Electrical Project Manager, Large Engineering Services Company …the technical liaison, proposed design, technical submittal, prompt reactions and quality of components and workmanship has been very good…The installation process dates when declared where adhered to and undertaken in a professional manner, under difficult circumstances with constant main contractor external works on-going around the access area … Continued
  • Mon, December 20, 2014 – Owner, Large Manor House

    Mon, December 20, 2014 – Owner, Large Manor House From my request for quotation to commissioning I was pleased with the prompt and efficient way your company and staff carried out the supply and delivery of the set. The delivery in spite of the short lead time was on the date promised and during the interim … Continued