24/7 Emergency Call-Out

Dark Overlay

Education

Reliable Power Solutions for Education Facilities

Whether you manage a school or a large educational campus, continuous heat and power is essential for safety, comfort, and uninterrupted learning. Power failures can disrupt classes, damage equipment, and create compliance risks – issues no Facilities Manager wants to face.

Why Power Continuity Matters for Education

  • Protect Learning Environments – Ensure classrooms, labs, and IT systems stay operational.
  • Meet Compliance Standards – Avoid costly downtime and maintain health and safety obligations.
  • Peace of Mind for FM Teams – Reliable backup solutions reduce risk and stress for on-site managers.

Optimising CHP Systems for Efficiency

Combined Heat and Power (CHP) systems generate heat and electricity simultaneously, making them ideal for larger educational sites with significant hot water demand. Campuses with swimming pools, sports facilities, or student accommodation often benefit most from CHP technology for heating and power.

These systems lower energy costs, can reduce carbon emissions by up to 30%, and help meet sustainability targets.

At Shenton Group, we maintain and optimise CHP systems to ensure they operate at peak efficiency and deliver the highest possible return on investment. For educational facilities running long hours, this means lower bills, greener energy, and reliable performance without compromise.

Backup Power Solutions

If the unthinkable happens and mains power fails, having a backup generator system ensures your site isn’t left in the dark. We design robust solutions for resilience and compliance, giving FM teams confidence that critical life safety services such as emergency lighting and lifts will continue to operate.

When a permanent generator isn’t required, our Power Call emergency generator rental connection service provides rapid response and peace of mind.

Ready to Protect Your Campus?

Contact Us

Our Latest News

  • Fri, April 26, 2013 – Facilities Maintenance Contract Manager, County Council

    Fri, April 26, 2013 – Facilities Maintenance Contract Manager, County Council Can you please give my thanks to the shentongroup engineers for successfully completing the generator panel modifications and testing of the system, I would like to thank Paul in particular for coping with the challenging situation under pressure, the shentongroup engineers performed excellently and … Continued
  • Wed, March 15, 2017 – Systems Manager, British University

    Brilliant Stuff Stephanie and you are welcome, I must say you guys have always helped us in a crisis and that counts for a lot… …As usual let me known when you have a team ready for the Hawkeye installation.
  • Thu, September 29, 2011 – Projects Manager MOD Site

    Thu, September 29, 2011 – Projects Manager MOD Site shentongroup site operatives were clean and tidy, courteous and professional in their conduct.
  • Wed, October 21, 2015 – Project Manager, Building Consultants

    Wed, October 21, 2015 – Project Manager, Building Consultants Grant and Mark have been a pleasure to deal with thus far with this project, and I’ll personally make sure that you guys are invited to work with us on any and all generator projects that come up. Thanks again.
  • David Harbour – Andover Radio

    Sorry – but I can’t give Shenton a higher rating! They are simply superb. Nothing too much trouble.
  • Ian Hedges – Briggs & Forrester

    Shenton Group provide us with excellent estimating support on many projects, always returning on time or advising up-front if it’s something they can’t offer, which is invaluable.Their professional and pro-active approach has cemented them as one of our go to providers for generator and UPS systems.
  • Thu, November 01, 2012 – Electrical Contractor

    Thu, November 01, 2012 – Electrical Contractor Please thank your engineer for his assistance yesterday with rectifying the phase rotation fault. Thank you for all your efforts with the quick turnaround, the client is very happy and pleased with the response to their demands
  • Wed, August 03, 2011 – Maintenance Manager – Food Manufacturer

    Wed, August 03, 2011 – Maintenance Manager – Food Manufacturer shentongroup Power Management’s service has been first class
  • Tues, May 12, 2015 – Managing Director, Leading UK Data Centre

    Tues, May 12, 2015 – Managing Director, Leading UK Data Centre Honestly it has been a pleasure working with Shenton. We have had several ‘bad ones’ in other contracts throughout our build but your guys have been on top form. We will be using you again for additional generator sets and maintenance in the future.
  • District Council

    With Power Call, we are confident that the Council can meet its business continuity and resilience obligations under the Civil Contingencies Act 2004 through an effective and reliable power security plan.
  • Wed, June 10, 2015 – Electrical Project Manager, Large Engineering Services Company

    Wed, June 10, 2015 – Electrical Project Manager, Large Engineering Services Company …the technical liaison, proposed design, technical submittal, prompt reactions and quality of components and workmanship has been very good…The installation process dates when declared where adhered to and undertaken in a professional manner, under difficult circumstances with constant main contractor external works on-going around the access area … Continued
  • Fri, July 25, 2014 – Tyre Specialists

    Fri, July 25, 2014 – Tyre Specialists Very happy with your company, we have a lot of power outages where we are and your generators have never failed to start, been excellent and the service is good. Don’t worry I would never think of going anywhere else when other project arise.