24/7 Emergency Call-Out

Dark Overlay

Education

Reliable Power Solutions for Education Facilities

Whether you manage a school or a large educational campus, continuous heat and power are essential for safety, comfort, and uninterrupted learning. Power failures can disrupt classes, damage equipment, and create compliance risks that no Facilities Manager wants to face. We’ve delivered standby generator and CHP solutions for universities including Exeter, Cambridge, Canterbury Christ Church and East Anglia. 

Why Power Continuity Matters for Education

  • Protect Learning Environments – Ensure classrooms, labs, and IT systems stay operational.
  • Meet Compliance Standards – Avoid costly downtime and maintain health and safety obligations.
  • Peace of Mind for FM Teams – Reliable backup solutions reduce risk and stress for on-site managers.

Optimising CHP Systems for Efficiency

Combined Heat and Power (CHP) systems generate heat and electricity simultaneously, making them ideal for larger educational sites with significant hot water demand. Campuses with swimming pools, sports facilities, or student accommodation often benefit most from CHP technology for heating and power.

These systems lower energy costs, can reduce carbon emissions by up to 30%, and help meet sustainability targets.

At Shenton Group, we maintain and optimise CHP systems to ensure they operate at peak efficiency and deliver the highest possible return on investment. For educational facilities running long hours, this means lower bills, greener energy, and reliable performance without compromise.

Power for University Campuses & Student Accommodation

University estates carry particular demands worth naming explicitly: large-scale student accommodation with continuous hot water demand, research facilities requiring uninterrupted power (see our Science & Research page), and phased construction programmes that need power infrastructure to keep pace with new buildings coming online. We’ve delivered: 

  • A CHP solution for the University of Exeter’s East Park development, providing 100 standard bedrooms and 504 en-suite rooms with efficient heat and power as the campus expanded 
  • A generator and CHP package for the University of Cambridge’s £79m Project Capella research laboratory 
  • A CHP solution for Canterbury Christ Church University’s new halls of residence, supporting a university with over 18,000 enrolled students 
  • Standby generator power for the University of East Anglia 

F&Qs

Backup Power Solutions

If the unthinkable happens and mains power fails, having a backup generator system ensures your site isn’t left in the dark. We design robust solutions for resilience and compliance, giving FM teams confidence that critical life safety services such as emergency lighting and lifts will continue to operate.

When a permanent generator isn’t required, our Power Call emergency generator rental connection service provides rapid response and peace of mind.

Ready to Protect Your Campus?

Contact Us

Our Latest News

  • Site Manager – NHS Trust

    Please can I take the opportunity to thank you, Roy, Paul, Stuart and Tom as well as James, David and Graham for the brilliant work you have delivered in ******* over the course of the past 3 months. The meticulous planning you carried out prior to day one meant that all staff in the clinical and … Continued
  • Wed, October 12, 2016 – Electrical Site Foreman, Building Services Company

    May I take this opportunity to thank you and your site team for the excellent service you have provided over the past 3 months at the **********. Special praise needs to go to Tom & Stuart who have shown true dedication and professionalism in delivering a successful project which at times has been a challenge!! … Continued
  • Fri, September 30th, 2016 – Project Manager, Infrastructure Company

    I wanted to thank you for your collaborative and reactive approach throughout the ******* Generator Controller replacement project.  I’d be grateful if you could also pass on myself and Peter’s thanks to the guys in the field who went out of their way to be flexible and help us fit in with ******* requirements and other … Continued
  • Sun, September 11, 2011 – Facilities Manager Software Company – Reading

    Sun, September 11, 2011 – Facilities Manager Software Company – Reading shentongroup engineers were exceptionally clean and tidy and carried out a quality installation. The project was completed on time and was good value for money.
  • Fri, November 7, 2014 – Electrical Site Foreman, Building Services Company

    Fri, November 7, 2014 – Electrical Site Foreman, Building Services Company I would like to take this opportunity to thank you and your site team for the excellent service you provided for the recent generator hire at the hospital. Special thanks goes to Tom and Doug for their professional manner in conducting the initial site … Continued
  • Derek Sidaway – Sedgwick International UK

    Professional, efficient, courteous, I cannot praise the company and the staff enough. Our project was to remove a generator and associated control equipment from site, couldn’t have gone any smoother!
  • Tue, October 16, 2012 -Electrical Reseller

    Tue, October 16, 2012 -Electrical Reseller Just a quick note to say a big ‘thank you’ for all your hard work and hospitality this morning and for a lovely lunch. You could not have made us more welcome. Also could you pass our thanks to Steve who stayed out there in all that wind and … Continued
  • Engineering Manager – Hospital

    Thank you very much for your help.  Shentons provided a very good, fast service.  
  • Tue, May 07, 2013 – Quality Manager, FM Contractor Company

    Tue, May 07, 2013 – Quality Manager, FM Contractor Company Thanks for being so efficient and making the process very smooth. We are very grateful and will look to use you in the future when required.
  • Fri, November 11, 2016 – Project Manager, M&E Contractor

    The Shentons visit went ahead and to be fair the guy was extremely helpful and practical  and thankfully he is the guy that will be coming back on the 8th to carry out the commission.
  • Tue, December 04, 2012 – Director, Construction Management

    Tue, December 04, 2012 – Director, Construction Management I would like to thank Keith for his professionalism on site and for getting the engine at Rochdale up and running.
  • Wed, November 18, 2015 – Mechanical Estimator, Building Services Company

    Wed, November 18, 2015 – Mechanical Estimator, Building Services Company The CPD was very informative and well presented. Richard could answer the vast majority of the questions thrown at him; certainly those within the realm of CHP and was friendly and approachable.