24/7 Emergency Call-Out

Dark Overlay

Education

Reliable Power Solutions for Education Facilities

Whether you manage a school or a large educational campus, continuous heat and power is essential for safety, comfort, and uninterrupted learning. Power failures can disrupt classes, damage equipment, and create compliance risks – issues no Facilities Manager wants to face.

Why Power Continuity Matters for Education

  • Protect Learning Environments – Ensure classrooms, labs, and IT systems stay operational.
  • Meet Compliance Standards – Avoid costly downtime and maintain health and safety obligations.
  • Peace of Mind for FM Teams – Reliable backup solutions reduce risk and stress for on-site managers.

Optimising CHP Systems for Efficiency

Combined Heat and Power (CHP) systems generate heat and electricity simultaneously, making them ideal for larger educational sites with significant hot water demand. Campuses with swimming pools, sports facilities, or student accommodation often benefit most from CHP technology for heating and power.

These systems lower energy costs, can reduce carbon emissions by up to 30%, and help meet sustainability targets.

At Shenton Group, we maintain and optimise CHP systems to ensure they operate at peak efficiency and deliver the highest possible return on investment. For educational facilities running long hours, this means lower bills, greener energy, and reliable performance without compromise.

Backup Power Solutions

If the unthinkable happens and mains power fails, having a backup generator system ensures your site isn’t left in the dark. We design robust solutions for resilience and compliance, giving FM teams confidence that critical life safety services such as emergency lighting and lifts will continue to operate.

When a permanent generator isn’t required, our Power Call emergency generator rental connection service provides rapid response and peace of mind.

Ready to Protect Your Campus?

Contact Us

Our Latest News

  • Facilities Manager, Risk Management Experts

    Hi Julie, Thank you for your help today.  This is the first time we’ve had a problem with our generator and I was reassured by the quick response.
  • Fri, July 25, 2014 – Tyre Specialists

    Fri, July 25, 2014 – Tyre Specialists Very happy with your company, we have a lot of power outages where we are and your generators have never failed to start, been excellent and the service is good. Don’t worry I would never think of going anywhere else when other project arise.
  • Thu, November 01, 2012 – Electrical Contractor

    Thu, November 01, 2012 – Electrical Contractor Please thank your engineer for his assistance yesterday with rectifying the phase rotation fault. Thank you for all your efforts with the quick turnaround, the client is very happy and pleased with the response to their demands
  • Mon, June 20, 2016 – Regional Manager, Mechanical and Electrical Company

    Mon, June 20, 2016 – Regional Manager, Mechanical and Electrical Company As per our email exchange on Friday, many thanks once again for sorting out this difficult situation, once again shentongroup have demonstrated excellent customer care in what was a difficult situation for us all.  We have a few projects starting to come on stream in … Continued
  • Mon, June 13, 2016 – Project Manager, Major Engineering Company

    Mon, June 13, 2016 – Project Manager, Major Engineering Company When I checked with my colleagues who’d worked with you before on the Newcastle jobs, they said ‘shentongroup are great to deal with. No concerns at all, and if there are ever any problems on a project they always get them sorted’.
  • Wed, July 27, 2016 – Owner, Production Services Company

    Wed, July 27, 2016 – Owner, Production Services Company Just a quick note to say thank you to you and your team for another fantastic year of generator delivery! Everything is so easy and I’m sure that is down to you personally. Doug and Tom were excellent as ever – they are so efficient (and also said … Continued
  • Service Engineer – Healthcare Sector

    I can’t emphasis how happy we are with the professional and extremely quick manor everything has been dealt with.
  • Mon, November 30, 2015 – Project Manager, Building Services Company

    Mon, November 30, 2015 – Project Manager, Building Services Company Can you please thank all you team for delivering this project yesterday to a successful conclusion. Our client and myself really appreciate all the efforts put in to this project.
  • Mon, February 25th, 2013 – RAF Lossiemouth

    I would like to formally record my utmost satisfaction regarding the installation of the UPS at Lossiemouth. From the initial planning stages to the meticulous inspection prior to leaving site, the contractor you selected has provided excellent service. The installation meets all of our needs and has been planned, and installed in such a way … Continued
  • Tue, December 04, 2012 – Electrical Reseller

    Tue, December 04, 2012 – Electrical Reseller I like working with Shenton. The engineers always turn up and do what they say they are going to do. What a delightful surprise – the shentongroup hampers are a legend
  • Fri, June 24, 2011 – Services Manager – International Publisher

    Fri, June 24, 2011 – Services Manager – International Publisher Thank you to all concerned. This project was executed effectively and efficiently. All your staff and contractors were excellent.
  • Thu, September 29, 2011 – Projects Manager MOD Site

    Thu, September 29, 2011 – Projects Manager MOD Site shentongroup site operatives were clean and tidy, courteous and professional in their conduct.