24/7 Emergency Call-Out

Dark Overlay

Education

Reliable Power Solutions for Education Facilities

Whether you manage a school or a large educational campus, continuous heat and power is essential for safety, comfort, and uninterrupted learning. Power failures can disrupt classes, damage equipment, and create compliance risks – issues no Facilities Manager wants to face.

Why Power Continuity Matters for Education

  • Protect Learning Environments – Ensure classrooms, labs, and IT systems stay operational.
  • Meet Compliance Standards – Avoid costly downtime and maintain health and safety obligations.
  • Peace of Mind for FM Teams – Reliable backup solutions reduce risk and stress for on-site managers.

Optimising CHP Systems for Efficiency

Combined Heat and Power (CHP) systems generate heat and electricity simultaneously, making them ideal for larger educational sites with significant hot water demand. Campuses with swimming pools, sports facilities, or student accommodation often benefit most from CHP technology for heating and power.

These systems lower energy costs, can reduce carbon emissions by up to 30%, and help meet sustainability targets.

At Shenton Group, we maintain and optimise CHP systems to ensure they operate at peak efficiency and deliver the highest possible return on investment. For educational facilities running long hours, this means lower bills, greener energy, and reliable performance without compromise.

Backup Power Solutions

If the unthinkable happens and mains power fails, having a backup generator system ensures your site isn’t left in the dark. We design robust solutions for resilience and compliance, giving FM teams confidence that critical life safety services such as emergency lighting and lifts will continue to operate.

When a permanent generator isn’t required, our Power Call emergency generator rental connection service provides rapid response and peace of mind.

Ready to Protect Your Campus?

Contact Us

Our Latest News

  • A

    Andy Hughes, Chief Technology Officer – Intelligence Hosting Services Limited

    After having major issues with a so called “Generator Specialist” we needed to find a company that was competent in ensuring our backup power facilities were installed correctly as well as safe. After speaking with Shenton Group over the phone, an initial site survey was carried out along with the works that were needed to … Continued
  • B

    Building Service Manager – Large M&E Company

    James, today’s training went well. Please let your mangers know Alex continued to be very thorough and professional when carrying out his work.
  • T

    Tues, May 12, 2015 – Managing Director, Leading UK Data Centre

    Tues, May 12, 2015 – Managing Director, Leading UK Data Centre Honestly it has been a pleasure working with Shenton. We have had several ‘bad ones’ in other contracts throughout our build but your guys have been on top form. We will be using you again for additional generator sets and maintenance in the future.
  • S

    Sat, August 06, 2011 – Contracts Manager – Computer Software FM Company

    Sat, August 06, 2011 – Contracts Manager – Computer Software FM Company shentongroup‘s service has been first class
  • M

    Mon, December 8, 2014 – Electrical Project Engineer, Leading Engineering Company

    Mon, December 8, 2014 – Electrical Project Engineer, Leading Engineering Company The ***** ***** Test went very well without a hitch. The Client Commissioning Manager & External Consult we’re very impressed with your generator and its integration with the LV Panel. Your engineer Tom and the LV Switch Board engineer worked well together pre-test and gave confidence … Continued
  • T

    Tue, November 08, 2011 – Head of ATM & Customer Support – Systems Integration Company

    Tue, November 08, 2011 – Head of ATM & Customer Support – Systems Integration Company Thank you for rearranging your busy schedule to fit in a Company overview presentation to myself and other team members of our Partnership organisations.
  • T

    Tue, November 08, 2011 – Electrical Design Engineer – University

    Tue, November 08, 2011 – Electrical Design Engineer – University We have received excellent service from shentongroup, which was able to advise us on the best possible way of ensuring that all our essential equipment could continue functioning during powercuts
  • T

    Tue, July 30, 2013 – Service Sales Engineer, Contract Reseller Company

    Tue, July 30, 2013 – Service Sales Engineer, Contract Reseller Company Our Client has emailed – he wants me to pass on a big thank you to James and everyone else involved in the Gene hire over the last week.
  • F

    Fri, July 25, 2014 – Tyre Specialists

    Fri, July 25, 2014 – Tyre Specialists Very happy with your company, we have a lot of power outages where we are and your generators have never failed to start, been excellent and the service is good. Don’t worry I would never think of going anywhere else when other project arise.
  • I

    Ian Hedges – Briggs & Forrester

    Shenton Group provide us with excellent estimating support on many projects, always returning on time or advising up-front if it’s something they can’t offer, which is invaluable.Their professional and pro-active approach has cemented them as one of our go to providers for generator and UPS systems.
  • M

    Mon, January 19, 2015 – Information Services, University

    Mon, January 19, 2015 – Information Services, University I’d like to offer a big THANK YOU for the work completed on Saturday. We are delighted with the result.  
  • M

    Mon, April 14, 2014 – Residential Care Specialists

    Mon, April 14, 2014 – Residential Care Specialists All looks really neat & tidy. Please pass on my thanks to the installation team for their good work!