When there is such a range of energy-saving and carbon reduction technologies available, it may often be difficult to decide amongst them. It is true to say that each individual technology should be considered on its own merits, and the services of a specialist consultant may be required in order to manage the performance and financial assessments that are part of this process.
Answering your CHP questions at UK AD & Biogas 2014 – Stand A061
What is a CHP system? What are the real benefits of using CHP systems? Are they suitable for all buildings? Where do they prove most efficient?
We will be answering these and other questions on power solutions and CHP at this years UK AD & Biogas event , showcasing our Gas Combined Heat and Power System – Power Therm.
CHP systems can drastically lower your energy bills and reduce your carbon footprint; they also have the capability to run fully independent from the electricity grid.
AMF Panels In Action
A recent project showed the use of AMF panels to meet the requirements of a Bristol based IT company that required a cost effective relocation of their existing back up power supply.
What is CHP?
Combined Heat and Power (CHP) is the simultaneous production of heat and electricity from a single fuel source, usually at the point of use.
With a CHP system a fuel (usually natural gas) is used to drive a reciprocating engine, delivering electricity from the alternator. At the same time the heat produced by the engine working, is captured from various sources (for example from the exhaust system and engine cooling circuits) to produce hot water. On some models heat is also recovered from the alternator and engine oil, further increasing efficiency.
Typically a CHP will produce up to twice the amount of heat energy as the electricity it generates.
Tues, April 22, 2014 – Strategic Project Manager
Tues, April 22, 2014 – Strategic Project Manager
I would like to thank Roland and Roy for their continued help with this project and the engineers who have visited for the duct fitting and commissioning…
…I realise it has been a very intensive project in terms of overall value versus the amount of communications required – (my email records stretch to over 600 on this one!) – so I really appreciate all the help.
Bournemouth Care Show Success!
“Our first exhibition of the year; Bournemouth Care show was a great Success”
The event took place 26-27 March at the BIC, Bournemouth. The show is dedicated to providing education, products and services for those running organisations responsible for the care of older or disabled people.
How do you calculate the financial Impact of a disaster to your Business?
From minor incidents to major disasters, there is no doubt this event will have a financial impact on your business. To evaluate the cost to your business you need to work out the following:
Structuring a successful emergency response team
Regardless of how robust your disaster recovery plan is, the success of its implementation will depend on the team that is responsible for it.
Structure your team by ensuring your selected member’s skills match the areas of responsibility. Below is a list of the key team members required and what they should be responsible for. In every case, there should be a primary and secondary member, both of whom will need to be equally briefed.
Bournemouth Care Show 2014
Shentongroup will be taking Power Call to the Bournemouth Care Show at the BIC on the 26th & 27th March 2014!
See below for the address.
Come and see us at stand W210 in the Windsor Hall; which is on the right-hand side as you come through from the Solent Hall. Here we will have a life size example of the connection panels so you can see exactly what Power Call involves, as well as lots of info about Power Call. Les Chapman (Sales & Technical Support) and Phil Chilton (Business Develpoment) will be on the stand to answer any questions you may have, and are offering a chance to sign up to a Power Call contract on the day.
What are the key areas to consider when disaster recovery planning?
When creating your disaster recovery plan, pre planning is vital. Follow these 3 steps to ensure you have all the elements to design a robust disaster recovery strategy.