On the 4th and 5th August 2015 we at shentongroup will be welcoming Clients and potential Clients as VIPs to the Grand Opening of our new London Office.
On the 4th and 5th August 2015 we at shentongroup will be welcoming Clients and potential Clients as VIPs to the Grand Opening of our new London Office.
Although capacity shortfalls have been on the cards for some years now, with autumn looming, the widely predicted power shortfalls and subsequent blackouts are an impending possibility and companies that depend on uninterruptible power supplies should act now to ensure there’s no significant break in their business.
As a leader in the standby power, uninterruptible power supply and combined heat and power system industry, we’ve provided organisations spanning finance, healthcare, telecoms, manufacturing, retail, education, government, utilities and sports/leisure for over 30 years.
shentongroup‘s Lowestoft office is an additional hub for our Sales and Technical team.
Back in 2012 the BBC reported how Ofgem was at the time warning how the UK was risking running out of energy generating capacity by the winter of 2015/16.
This project consisted of the supply of a new 680kVA, 3 phase, 50 Htz Standby Generator for a major tower development in London.
With only one day gone shentongroup has already had incredible success at UK Ad & Biogas 2015 at the NEC.
For this project shentongroup are installing 9 x 88 kVA Generators over a set period of time at the client’s request.
Back in April shentongroup announced that we had won a 5.5 MVA Generator project. We can now proudly announce that six of the ten 550 kVA Generators are now off the production line ahead of schedule.
The client wanted 2 New 385 kVA Generators installed in separate areas of the site one of which needed the installation of a Hot Air Out Duct section and also a Twin walled Exhaust to the Roof of the Building.