Shenton Group News

Case Study: Amazon Distribution Centres

Client: Amazon Direct Sector: Distribution Location: Tilbury Products/ Services 3 x 1250kVA’s Bulk tanks Cable Artic trailers Install/deinstall Transport Baby sitting Fuel management Background Amazon Direct is one of the largest distributors in the UK with over 30 warehouses operating currently. In 2021 an unplanned service requirement arose in one…

Read More

Butchers Pet Care Reduces CO2 Emissions & Energy Costs With CHP

Client: Butchers Pet Care Sector: Industrial – Food & Drink Location: Northampton Products/ Services  1 x Tedom Quanto 1,560kWe CHP  Exhaust Recovery Steam Boiler  Solution Design  Environmental permitting assistance  Grid application support  Planning support  Civil works  Delivery, off-loading and positioning  Installation & Commissioning Mechanical and electrical integration  CHP maintenance contract  G99 relay,…

Read More

Reliable Backup: Eight Generators Ensuring Resilience

BACKGROUND Being one of the largest online retailers, the project required a reliable and resilient solution to ensure their distribution centre could remain operational in the event of a power outage.  PROJECT OVERVIEW Working closely with the consultant from the initial stages, Shenton Group offered a unique approach to providing…

Read More

Shenton Group Supplies Ocado with Standby Power Solution

Client – OcadoLocation: Andover BACKGROUND In February 2019, the Ocado CFC in Andover caught fire and was virtually destroyed. Two years after the fire, Ocado is pleased to confirm that the rebuild of the replacement customer fulfilment centre (“CFC”) continues to proceed at pace and is scheduled to open…

Read More

Royal Mail Gets a Royal Backup Power Solution From Shenton Group

BACKGROUND As the Royal Mail continue to invest in their infrastructure, Shenton Group were once again called upon to offer a resilient standby power solution to support one of their distribution centres. The project was progressing under tight deadlines, and a well-respected M&E contractor contracted Shenton Group to design, supply…

Read More

Another Lidl Distribution Centre Backed By Shenton

BACKGROUND Having worked on many Lidl projects in the past, Shenton Group were again involved in providing the backup power solution for Lidl’s Peterborough distribution centre. Working with the consultant from the early design stages, we helped develop a cost-effective and resilient solution whilst also limiting the footprint required on…

Read More

Shenton Group Provides Backup Power to Amazon Distribution Centres

BACKGROUND With same-day delivery now expected as the norm, the UK has seen tremendous investment in distributions centres. Along with many of the largest logistical companies, Amazon has invested heavily in their infrastructure of distribution centres up and down the country. With location being of paramount importance to any Distribution…

Read More

Backup Power Solution for Leading Retailers New ‘Green’ Store

End User: IKEALocation: Greenwich BACKGROUND Having worked on a number of projects previously for this global retail client, Shenton Group was again appointed to design, supply and install the standby power solution. The new store located in Greenwich was designed to be 80% more energy efficient than the current…

Read More