shentongroup – Tedom’s Partner for UK and Ireland – enjoyed exhibiting again this year at the 2013 ADBA show in Birmingham. Our Sales Director remarked that there is “Lots of potential in the industry for the Tedom biogas CHP units, but the marketing is still maturing”.
Loadbank vehicle Investment
Fully understanding the difficult needs of our clients these days, shentongroup have invested in a bespoke loadbank vehicle.
Delivery of this vehicle is expected within August and will allow shentongroup to carry out load tests in more compact areas. Without requiring a trailer, the loadbank vehicle can access the generators in many more applications.
This forward move further improves service coverage to our hundreds of nationwide clients.
ADBA Exhibition 2013
With over 240 exhibitors booked, organisers are confidently expecting to exceed last year’s visitor attendance at this ADBA Exhibition 2013. A wide and varied profile of personnel will visit the show, including senior decision makers, influential end-user clients, and key figures from industry, regulatory bodies, manufacturers, and finance providers.
Following a successful showing at the 2012 Anaerobic Digestion & Biogas Exhibition, shentongroup are again exhibiting there on 3rd and 4th July 2013.
Come and visit us on stand G05
CHAS Accreditation
shentongroup has recently secured Contractors Health & Safety Scheme (CHAS) accreditation status adding to the list which already includes ISO 9001, ISO 14001, Achilles and Safe Contractor. This is further proof that we recognise the importance of Health & Safety in our world today. At shentongroup, we are committed to the continued safety of our clients, staff and working partners.
Seven steps to successful standby power for data centres
A resilient system for data centre power protection and security is critical to business continuity and resilience. That’s a given. Although there are various elements to a full turnkey standby power solution including; UPS systems, battery banks, power distribution networks, switch gear, bulk fuel storage etc, we’ve chosen to focus the attention on generators in this article, which is undoubtedly the keystone to the power support structure.
The forecast of Britains future energy issues
A programme broadcast on the BBC highlighted the possibly energy issues facing Britain over the coming decades.
Fri, April 26, 2013 – IT Manager, Housing Association
Fri, April 26, 2013 – IT Manager, Housing Association
The install was completed OK, Andrew was very professional and all went very well, thank him.
Protecting your Residents during a Power Cut
A look at modern Standby Power Solutions
Unacceptable Care
You are the manager of a care home and it is a cold, Winter night. Suddenly the lights flicker and within seconds the whole building is plunged into darkness. Without mains power you have no lifts, no lights, no heating, no hot water, no kitchens, no kettles, no laundry…the list just goes on! More importantly your residents will be dark, cold, unsafe and confused.
Do you have any idea for how long?
Without CHP you could be out in the cold
Energy costs have risen more than a 100% in the past 12-months while businesses are now bracing themselves for further electricity hikes with the introduction of new legislation to cut the amount of CO2 we omit. CHP is almost twice as efficient as conventional power generation and can save some companies up to 50% in electricity costs.
Taking a view on the need for regular maintenance and service of air circuit breakers
Air Circuit Breakers (ACBs) are used as circuit protection for a wide range of low voltage (up to 600V AC) applications, typically generators, MCCB distribution boards, UPS, small power stations, etc with sizes ranging from 400A to 6300A or larger. Protection is provided in either 3 or 4 pole configurations. Additional protective devices can be fitted such as undervoltage releases and shunt trip coils together with auxiliary contacts for remote signalling.